My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 04-21-2008
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2008
>
04-21-2008
>
5.3. SR 04-21-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2008 1:42:57 PM
Creation date
4/18/2008 12:07:44 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E & 0 Tool & Plastics, Inc. <br /> <br />Complete Tooling & Molding Capabilities <br />ISO 9001 · 2000 Registered <br />19178 Industrial Blvd., Elk River, MN 55330 (763) 441-6100 · Fax (763) 441-6452 <br /> <br />E & 0 Conditional Use Permit Narrative <br /> <br />E&O Tool and Plastics seeks to construct a modem manufacturing facility that will allow <br />them the ability to compete in the highly competitive medical device market. The <br />building will serve as the new headquarters and will house all domestic operations for the <br />company. <br /> <br />The 55,000sq ft facility will be of tilt-up construction with material and reveal patterns to <br />give the appearance of a varied and architecturally pleasing structure. Wall heights vary <br />from 28 to 32 ft, with a prominent glass entry in the NW comer of the building which <br />will face the entry of the Metal Craft building. E & 0 will have signage on the buildings <br />north elevation facing Hwy 10, and will provide 97 parking spaces on the sites north side <br />with 2 access points on to Business Center Drive for the approximately 125 employees <br />that operate the company presses 24 hours per day, 7 days per week. <br /> <br />The building will also have 6 docks, and 1 drive in door, 2 material storage silos, and 1 <br />chiller cooling unit all of which are on the east side of the building facing Faribault <br />Foods. The 2 silos stand approximately 30 ft high. The chiller unit stands <br />approximately 13 feet high. The silos and the chiller unit are located adjacent to the <br />building on the east side. The silos are for material storage only. The material is pumped <br />into the silos via vacuum pump so there is no external mess. There is also no fumes or <br />odiferous result associated with either the silos or the chiller. Silos are typically filled <br />during day hours between 8:00am and 5:00pm and will be screened from view to <br />residents on the south by a row of evergreens as shown in the landscape plan. <br /> <br />Thank you for your consideration. <br /> <br />Sincerely, <br /> <br /> <br />Jay Caswell <br />CFO / Partner <br />E & 0 Tool and Plastics, Inc. <br /> <br />~I\ -- CJ-..gel --.... <br />-- . ,~,.."- /~ <br />.. -.A ...J ..,J , L.. <br />. ...-:d 3.l it( <br />
The URL can be used to link to this page
Your browser does not support the video tag.