2.3.11.1 Based on the Construction Manager's observations <br />and evaluations of each Contractor's Application for Payment, <br />the Co.'~struction Manager shall review and certify tile amounts <br />due the respective Contractors. <br /> <br />2.3.11.2 The Construction Manager shall prepare a Project <br />Application for Payment based on the Contractors' Certificates <br />for Payment. <br /> <br />2.3.11.3 The Construction Manager's certification for payment <br />shall constitute a representation to the Owner, based on <br />the Construction Manager's determinations at the site as pro- <br />vialed in Subparagraph 2.3.13 and on the data comprising <br />the Contractors' Applications for Payment, that, to the <br />best of the Construction Manager's knowledge, information <br />and belief, the Work has progressed to the point indicated <br />and the quality of the Work is in accordance with the Contract <br />Documents. The foregoing representations are subject to <br />an evaluation of the Work for conformance with the <br />Contract Documents upon Substantial Completion, to <br />results of subsequent tests and inspections, to minor <br />deviations from the Contract ,Documents correctable prior <br />to completion and to specific qualifications expressed by the <br />Construction Manager. The issuance of a Certificate for <br />Payment shall further constitute a representation that the <br />Contractor is entitled to payment in the amount certified. <br /> <br />2.3.11.4 The issuance of a Certificate for Payment shall not <br />be a representation that the Construction Manager has (1) made <br />exhaustive or continuous on-site inspections to check the <br />quality or quantity of the Work, (2) reviewed construction <br />mean~, methods, techniques, sequences for the Contractor's <br />own \Vork, or procedures, (3) reviewed copies of requisitions <br />received from Subcontractors and material suppliers and other <br />data requested by the Owner to substantiate the Contractor's <br />right to payment or (4) ascertained how or for wi-mt purpose <br />the Contractor has used money previously paid on account <br />of the Contract Sum. <br /> <br /> 2.3.12 The Construction Manager shall review the safety <br /> programs developed by eacti of.the Contractors for pur- <br /> poses of coordinating the safety programs with those of the <br /> other Contractors. The Construction Manager's responsibilities <br /> for coordination of safety programs shall not extend to direct <br /> control oxer or charge of the acts or omissions of the Con- <br /> tractors, Subcontractors, agents or employees of the Con- <br /> iractors or Subcontractors, or any other persons performing <br /> portions of the Work and not directly employed by the <br /> Construction Manager. <br /> <br /> 2.3.13 The Construction Manager shall determine in gen- <br /> eral that the Work of each Contractor is being performed in <br /> accordance with the requirements of the Contract Documents, <br /> endeavoring to guard the Owner against defects and deficien- <br /> cies in the Work. As appropriate, the Construction Manager <br /> shall have authority; upon written authorization from the <br /> Owner, to require additional inspection or testing of the Work <br /> in accordance with the provisions of the Contract Documents, <br /> whether or not such Work is fabricated, installed or com- <br /> pleted. The Construction Manager, in consultation with the <br /> Architect, may reject Work which does not conform to the <br /> requirements of the Contract Documents. <br /> <br /> 2.3.14 The Construction Manager shall schedule and coor- <br /> dinate thc sequence of construction in accordance with the <br /> Contract Documents and the latest approved Project con- <br /> struction schedule. <br /> <br /> 2.a.lS \Vith respect to each Contractor's own Work, the Con- <br /> struction Manager shall not have control over or charge of <br /> <br />and shall not bc responsible for construction means, meth- <br />ods, techniques, sequeqces or procedures, or for safety <br />precautions and programs in connection with the Work of <br />each of the Contractors. since these are solely the Contrac- <br />tor's responsibility under the Contract for Construction. The <br />Construction Manager shall not be responsible for a Contrac- <br />tor's failure to carry out the Work in accordance with the <br />respective Contract Documents. The Construction Manager <br />shall not have control over or charge of acts or omissions of <br />the Contractors, Subcontractors, or their agents or employees, <br />or any other persons performing portions of the Work not <br />directly employed by the Construction Manager. <br /> <br />2.3.16 The Construction Manager shall transmit to the Archi- <br />tect requests for interpretations of the meaning and intent of <br />the Drawings and Specifications, and assist in the resolution <br />of questions that may arise. <br /> <br />2.3,17 The Construction Manager shall review requests for <br />changes, assist in negotiating Contractors' proposals, submit <br />recommendations to the Architect and Owner, and, if they <br />are accepted, prepare Change Orders and Construction <br />Change Directives which incorporate the Architect's modifi- <br />cations to the Documents. <br /> <br />2.3.18 The Construction Manager shall assist the Architect in <br />the review, evaluation and documentation of Claims. <br /> <br />2.3.19 The Construction Manager shall receive certificates of <br />insurance from the Contractors and forward them to the <br />Owner with a copy to the Architect. <br /> <br /> 2.3.20 In collaboration with the Architect, the Construction <br /> Manager shall establish and implement procedures for expe- <br /> diting the processing and approval of Shop Drawings, Prod- <br /> uct Data, Samples and other submittals. The Construction <br /> Manager shall review all Shop Drawings, Product Data, Sam- <br /> pies and other submittals from the Contractors. The Construc- <br /> tion Manager shall coordinate submittals with information <br /> contained in related documents and transmit to the Archi- <br /> tect those which have been approved by the Construction <br /> Manager. The Construction Manager's actions shall be taken <br /> with such reasonable prompmess as to cause no delay in the <br /> Work or in the activities of the Owner or Contractors. <br /> <br /> 2.3.21 The Construction Manager shall record the progress <br /> of the Project. The Construction Manager shall submit writ- <br /> ten progress reports to the Owner and Architect including in- <br /> formation on each Contractor and each Contractor's Work, <br /> as well as the entire Project, showing percentages of com- <br /> pletion. The Construction Manager shall keep a daily log con- <br /> taining a record of weather, each Contractor's Work on the <br /> site, number of workers, identification of equipment, ~t)rk <br /> accomplished, problems encountered, and other similar rele- <br /> vant data as the Owner may require. <br /> <br /> 2.3.22 The Construction Manager shall maintain at the Proj- <br /> ect site for the Owner one record copy of all Contracts, Draw- <br /> ings. Specifications, addenda, Change Orders and other <br /> Modifications, in good order and marked currently to record <br /> changes and selections made during construction, and in <br /> addition, approved Shop Drawings, Product Data, Samples and <br /> similar required submittals. The Construction Manager shall <br /> maintain records, in duplicate, of principal building layout <br /> lines, elevations of the bottom of footings, floor levels and <br /> kev site elevations certified by a qualified surveyor or profes- <br /> sit~nal engineer. The Construction Manager shall make all such <br /> records available to the Architect and upon completion of the <br /> Project shall deliver them to tile Owner. <br /> <br />AIA DOCUMENT BS01/CMa ~' OWNER-CONSTR[ (.-I'ION MANA(3ER AGREEMENT * 1992 <br />EDITION · AIX~ · t~lO~)2 · ]'lie AMERICAN INSTITUTE OF ARCIII'rECTS. I-35 NE"g,' <br />YORK A\'ENt E, N.\V, x.V:S, 5111NGTON. DC. 2o~o6-5292 · WARNING: Unlicensed <br />photocol:~/ing violates U.S. col:s/right law~ and will subject the violator to legal prosecution. <br /> <br />B801/CMa-1992 4 <br /> <br /> <br />