My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 01-28-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
01/28/2002
>
6.1. SR 01-28-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:03 AM
Creation date
12/17/2002 4:46:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.5 The Architect shall submit design documents to the Owner at intervals appropriate to <br />the design process for purposes of evaluation and approval by the Owner. The Architect Shall <br />be entitled to rely on approvals received from the Owner in the further development ofihe <br />design. <br /> <br />2.1.6 <br />filing documents required for the approval of governmental authorities <br />the Project. <br /> <br />The Architect shall assist the Owner in connection with the Owner': <br /> <br />2.1.7 EVALUATION OF BUDGET AND COST OF THE WORK <br />2.1.7.1 When the Project requirements have been sufficiently <br />prepare a preliminary estimate of the Cost of the Work. <br />area, volume or similar conceptual estimating techniques. As <br />through the end of the preparation of the Construction Docume~ <br />and refine the preliminary estimate of the Cost of the Work. <br />Owner of any adiustments to previous estimates of the Cost o <br />in Project requirements or general market conditions. <br />the Cost of the Work exceeds the Owner's budget, <br />recommendations to the Owner to adjust the Project's <br />shall cooperate with the Architect in making <br /> <br />th~ ~chitect shall <br /> on current <br /> <br />progresses <br /> <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect to <br /> <br />AUTHENTICATION OF THIS <br />ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING <br />AIA DOCUMENT D401. <br /> <br />2.1.7.2 Evaluations of the Owner's budget for the Project, <br />Cost of the Work and updated estimates of the Cost of the Work <br />represent the Architect's judgment as a design professional familiar with the <br />industry. It is recognized, however, that neither the Architect nor the Owner has control over ' i:: ~ <br />the cost of labor, materials or equipment, over the Contractor's methods of determining bid <br />prices, or over competitive bidding, market or negotiating conditions. Accordingly, the <br />Architect cannot and does not warrant or re <br />from the Owner's budget for the Pro <br />evaluation prepared or agreed to by the <br /> <br />2.1.7.3 In preparing estimates of the Cost of the Wdrk;::the Architect shall be Permitted to <br />include contingencies for design bidding and price escalation; to determine what materials, <br />equipment component systems and types of construction ale ~0 be included in the Contract <br />Documents; to make reasonable adjustments in the scope of the Pii6iect ~dto ~clude in the <br />Contract Documents alte, rnate bids as may be necessary to adiU~t4heest~ated;Cost of the <br />Work to meet the Owner s budget for the Cost of the Work. If an ih :the'C°ntract Sum <br />occurring after execution of the Contract between the Owner and thd~'niractor~cafi~es the <br />budget for the Cost of the Work to be ~ et shall be increased acc°rd~glY~~ <br /> <br />2.1.7.4 If bidding or within 90 days after the Architect ,..i, <br />submits the Construction ~dget for the Cost of the Work shall <br />be adjusted to reflect change~:~ the general level 6f the construction industry. <br /> <br />2.1.7.5 If the budget for the Cost of the Work is~exceed~d by the lowest bona fide bid or <br />negotiated proposal, the owner Shall: <br /> .1 give writteg approval of an increaseinS~e budget for the Cost o f the Work; <br /> .2 autho~ ~bid~g or renegofiatingofthe Project within a reasonable time; <br /> terminate in accordance with Subparagraph L3.8.5 or <br /> .4 cooperate tn revising the Project slope and quality as required to reduce the Cost <br /> of the Work. <br /> <br />1 <br /> <br />2.1.7.6 I£ the Owner chooses to proceed under Claus~ 2.1.7.5.4, the Architect, without <br />additional compensation, shall 'modify the documents for which the Architect is responsible <br />under this Agreement as necesgary to comply With the budget for the Cost of the Work. The <br /> <br />© 1997 AIA® <br />AIADOCUMENTB141 1997 <br />STANDARD FORM AGREEMENT <br /> <br />The American Institute of Architects <br />1735 New York Avenue N.W. <br />Washington, D.C. 20006-5292 <br /> <br />© 1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967, 1970, 1974, 1977, 1987, © 1997 by The American <br />Institute of Architects. Reproduction of the material herein or substantial quotation of its provisions <br />without written permission of the AIA violates the copyright laws of the United States and will subject the <br />violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will <br />subject the violator to legal prosecution. This document was electronically produced with permission of the <br />AIA ano can be reproduced in accordance with your license without violation until the date of expiration as <br />noted below, expiration as noted below, expiration as noted below. User Document: 976141 ch & ps.aia -- <br />1/23/2002. AIA License Number 1017145, which exp~ res on 9/30/2002. <br /> 14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.