My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 01-28-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
01/28/2002
>
6.1. SR 01-28-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:03 AM
Creation date
12/17/2002 4:46:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1997 Edition - Electronic FOrmat <br /> <br />Standard Form of Architect's Services: <br />Design and Contract Administration <br /> <br />TABLE OF ARTICLES <br /> 2.1 PROJECT ADMINISTRATION SERVICES <br /> <br /> 2.2 SUPPORTING SERVICES <br /> <br /> 2.3 EVALUATION AND PLANNING SERVICES <br /> <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect to <br />its completion or modification. <br />AUTHENTICATION OF THIS <br />ELECTRONICALLY DRAFTED AIA <br /> DOCUMENT MAY M OE US,~ <br /> AIA DOCUMENT D401. <br /> <br />2.4 DESIGN SERVICES <br /> <br />2.5 CONSTRUCTION PROCUREMENT SERVICES <br /> <br />2.6 CONTRACT ADMINISTRATION SERVICES <br /> <br />2.7 FACILITY OPERATION SERVICES <br /> <br />2.8 SCHEDULE OF SERVICES <br /> <br />2.9 MODIFICATIONS <br /> <br />ARTICLE 2.1 PROJECT ADMINISTRATION SERVICES <br /> 2.1.1 The Architect shall manage the Architect's services <br /> Architect shall consult with the Owner, research applicable design <br /> meetings, communicate with members of the Project team and issue <br /> Architect shall coordinate the se ~ p~ided byfl~g:Arc, hitect and the <br /> with those services provided by th~i~ ~ the er S consultants. <br /> <br /> 2.1.2 When Project re~Ui/e~[h~S have been?sufficientl' <br /> prepare, and periodically fipdate, a Project <br /> decisions required of thb' CiWnfr, design <br /> <br />The <br /> <br />/ <br /> <br /> shall <br /> ~or <br />fletion of <br /> <br />documentation provided by the Architect, commencement of construction and Substantial <br />Completion of the Work. <br /> <br />2.1.3 The Architect shall consider the value Of alternative materials, building systems and <br />equipment, together with other ~0hsiderations based on program, budget and aesthetics in <br />developing the design for the Project. <br /> <br />2.1.4 Upon request of the Owner, the Architect shall makefi presentation to explain the <br />design of the Project to representatives of the Owner. <br /> <br />I <br /> <br />© 1997 AIA® <br />AIA DOCUMENT B141 - 1997 <br />STANDARD FORM AGREEMENT <br /> <br />The American Institute of Architects <br />1735 New York Avenue N.W. <br />Washington, D.C. 20OO6-5292 <br /> <br />© 1917, 1926, 1948, 1951, 1953, 1958, 1961, 1963, 1966, 1967r]970, 1974, 1977, 1987, © 1997 by The American <br />'nstitute of Architects. Reproduction of the material herein or substantial quotation of its provisions <br />zithout written permission of the AIA violates the copyright laws of the United States and will subject 1he <br />violator to legal prosecution. WARNING: Unlicensed photocopying violates U.S. copyright laws and will <br />subject the violator to legal prosecution· This document was electronically produced with permission of the <br />AIA and can be reproduced in accordance with your license without violation until the date of ex pira!ion as <br />noted below, expiration as noted below, expiration as noted below. User Document 97b141 ch & ps.aia -- <br />112312002. AIA License Nu tuber 1017145, which expires on 9/30/2OO2 <br /> 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.