My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 01-28-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
01/28/2002
>
4.4. SR 01-28-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:03 AM
Creation date
12/17/2002 4:41:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
· Minnesota Pollution Control Agency <br />· Minnesota Department of Transportation <br />· Minnesota Department of Health <br />· Minnesota Pollution ControlAgency <br /> <br />Sanitary Sewer <br />Street/Storm Sewer <br />Watermain <br />Grading <br /> <br />VII. ESTIMATED PROJECT COST <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are summarized in Table Two. A detailed preliminary construction cost <br />estimate is provided in the Appendix. In accordance with the City's Assessment <br />Manual, the overhead costs have been estimated as 28% of the total construction cost. <br />The overhead cost includes City administration, engineering design, construction <br />staking and inspection, and fiscal and legal costs. No costs have been included for the <br />acquisition of utility easements and rights-of-way since it is assumed they will be <br />dedicated. Although no acquisition costs have been included, the overhead costs were <br />increased by $10,000.00 due to administration costs incurred to acquire them. <br /> <br /> Table 2 <br /> Project Cost Estimate <br /> <br />Street Improvements <br />Sanitary Sewer Improvements <br />Watermain Improvements <br />Storm Sewer improvements <br />Trunk Highway 10 - Crossing Closures <br />Construction Cost <br /> Contingency (5%) <br /> Total Construction Cost <br /> Administration, Engineering, Fiscal & Legal <br /> Total Project Cost <br /> <br />$206,000 <br />48,000 <br />43,200 <br />8,100 <br />10,000 <br />$315,300 <br />16,000 <br />$331,300 <br />103,000 <br />$434,300 <br /> <br />FEAS-STUDY 7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.