Laserfiche WebLink
Ms. Michele McPherson <br />March 12, 2002 <br />Page Two <br /> <br />The third page of the final plat appears to have forgotten the drainage and utility easement <br />covering the entire common area of Lots 7, 8, and 9. If these are added again, the 10-foot <br />drainage and utility easements adjacent to the street are redundant. <br /> <br />The 10-foot drainage and utility easement around the perimeter of Outlot G is <br />unnecessary. This can be provided when the outlot is final platted. It should be noted that <br />the alignment of a street through Outlot G and where it ultimately hits the south boundary <br />of Trott Brooks Farms South is still unresolved. This does not need to be resolved at this <br />point in time, but will need to be resolved prior to final platting of Outlot G. <br /> <br />The 10-foot drainage and utility easement along the perimeter of Outlot F should continue <br />all the way to the south plat boundary into the United Power Association easement. <br /> <br />The final plat is showing an area in the southwest corner that would be part of the Tyler <br />Street right-of-way. It was our understanding that this right-of-way was taken in fee title. <br />Apparently, the document could not be found at the County or was never properly <br />recorded. In any case, this area should be platted as the Tyler Street right-of-way to clean <br />up this issue. <br /> <br />There appears to be something wrong with the dedication of Outlot D. It is our <br />understanding that Outlot D is to serve as a trail corridor between Trott Brook Farms South <br />and Hillside Park to the east. This should be reviewed and corrected, if necessary. <br /> <br />If you have any questions regarding these issues, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:tw <br /> <br />Ltr 3-11-02 McPherson[1] <br /> <br />Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />