= <br /> <br />City Council <br />August 15, 2002 <br />Page Two <br /> <br />on installation of the signal bases and the wiring for the new signal at TH 10 and Waco Street <br />while they wait for the delivery of material to install at the various locations. It is our <br />understanding that the mast arms and poles should be shipped the week of August 12, 2002, <br />and installation of the actual signals should begin the week of August 19, 2002. The left turn <br />arrow material is scheduled to be delivered to the contractor on August 20, 2002, and <br />installation will likely take place in less than a day. <br /> <br />1 75th Avenue Improvements <br />Contract was just awarded to S. R. Weidema, Inc., and a preconstruction meeting is <br />scheduled for Thursday, August 14, 2002. It is anticipated the contractor will begin <br />immediately by milling the road possibly as early as this Friday. This will be followed by <br />sanitary sewer installation, and pending the decision by the Elk River Municipal Utilities water <br />installation. Once the utilities are installed, street construction will begin immediately. There is <br />minimum elevation change--only a slight widening of the road base to support the wider road <br />section. The contractor will easily finish the utilities and street construction through the first lift <br />of blacktop. The final lift of blacktop and possibly the trail will be installed in 2003 with final <br />restoration and clean up completed next year also. <br /> <br />Orono Parkway Improvements <br />This project was just recently awarded to Jay Brothers, Inc. The preconstruction meeting for <br />the project was held on Wednesday, August 14, 2002. The project includes the modifications <br />to the median necessary for the expansion of City Hall and construction of the Public Safety <br />Building. The project will include the removal of the lights along Orono Parkway. The lights <br />will be delivered to the Public Works facility and used at a later date in Lion's Park. The <br />second component of the project is the repair at the intersection of 193rd Avenue and Evans <br />Street. This includes replacement of the concrete valley cutter across Evans Street and some <br />milling and overlaying of the westbound lanes of 193rd Avenue and southbound lanes of Evans <br />Street. <br /> <br />Watermain Extension to the Public Works Facility <br />This project was initiated by the City to provide sufficient water quantity and pressure to the <br />Public Works facility to operate a new fire suppression sprinkler system to be installed in the <br />building. The watermain will be directionally bored from Triangle Road in the Elk River <br />Industrial Park to the Public Works facility. Award of this project is a City Council agenda item <br />for consideration at your August 19, 2002, meeting. <br /> <br />Main Street Left Turn Lane Expansion <br />Construction on this project is complete. We are currently working on the paperwork to finalize <br />the contract. <br /> <br />2003 Pavement Rehabilitation Project <br />The first project considered under the pavement management program by the City Council in <br />early 2002 is currently beginning. Survey crews are picking up existing topography <br />information for the preparation of base maps leading up to an informational meeting with <br />affected property owners in the fall of 2002. This will be followed by a feasibility study, public <br />hearing and preparation of plans and specifications through the winter months of 2002, <br /> <br />Ltr-081302-Council.doc <br /> <br />Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />