My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. SR 08-19-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
08/19/2002
>
7.4. SR 08-19-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:54 AM
Creation date
9/24/2002 4:08:07 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 7.4. <br /> <br /> Howad R, Green Company <br />August 15, 2002 <br />File: 230000M-0325 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: PROJECT STATUS REPORT <br /> <br />Dear Council Members: <br /> <br />City Administrator Pat Klaers has asked me to prepare a memo updating the City Council on the <br />status of the various engineering projects now underway in the City. I have broken this update down <br />into three sections: City initiated projects, developer projects, and miscellaneous projects. The status <br />of the various engineering projects is as follows: <br /> <br />A. CITY PROJECTS <br /> <br />Zane Street Improvements <br />This is the MnDOT cooperative agreement project in the area of Saxon Motors and Napa Auto <br />Parts. The purpose of the project is to close the Trunk Highway 10 (TH 10) access at Zane <br />Street, including the median opening. This area will be connected at the east end to Zane <br />Street to the Mississippi Ridge development. The project also included the extension of lateral <br />sanitary sewer and watermain to service the businesses in this area. The contractor for this <br />project is S. R. Weidema, Inc. The status of the project is the utilities are now complete and <br />the contractor is beginning work on the street construction. It is anticipated that the concrete <br />curb and gutter will be poured within the next few days, followed by street construction, and <br />finally, the closing of the access on TH 10. The final lift of blacktop will be placed on this <br />project in 2003. <br /> <br />Through negotiations with the owners of Saxon Motors and Napa Auto Parts, the alignment'of <br />the road was changed slightly. The two owners of these businesses donated property for the <br />realignment with the understanding that the existing right-of-way would be vacated at the end <br />of the project. This will be accomplished through a replating process of the old right-of-way <br />and these two business properties. This plat will move forward through the Planning <br />Commission and City Council in the fall of the year. <br /> <br />= <br /> <br />Various Signal Improvements <br />The contract has been awarded to Design Electric, Inc., for the various signal improvements, <br />which include a new signal system at TH 10 and Waco Street, the installation of a fourth leg of <br />the intersection of TH 10 and 171st Avenue, installation of left turn arrows in two directions at <br />the intersection of School Street and Jackson Avenue, and the installation of emergency <br />vehicle preemption detectors at three intersections. Thus far the contractor has been working <br /> <br />Ltr-081302-Council.doc <br /> <br /> 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.