Laserfiche WebLink
Summary <br />The train station consists of two platforms, one on each side of the ttacks. Each platform will include <br />lightuig, benches, and advisory signage. The platform nearest the parking lot will include some covered <br />shelters and a ticket kiosk. There is no plumbing proposed for the site. <br />The parking lot improvements will include an expansion of the 350 stall parking lot to approximately 700 <br />stalls. The parking lot design includes numerous landscaping islands which meet and exceed our design <br />xeyuirements and will accommodate bus traffic. Storm water collected throughout the site will drain <br />toward a water detention pond, on the west side of the site. <br />Financial Impact <br />None <br />Attachments <br />Site plan drawings <br />Aetlon Motion 6y Second by ti ote <br />Follow Up <br />C:\Docvmevts and Setdvgs'\jmillex\Local Sectivgs\'I'empomry Ivtemet Files\OLK3II\'Iuain sCatiov memo [o CC 47-08 (2).doc <br />