Laserfiche WebLink
~~ <br />Priority Project/Third Lane Efforts <br />• Work with Mn/DOT to determine bus shoulder <br />lanes, phasing of bridge construction over the <br />railroad, and other design standards <br />• Determine how additional costs will be fund <br />- Local matching funds, federal appropriations request, <br />other sources <br />• Ensure no funds are lost due to timing constraints <br />for using state dollars <br />- Assist Mn/DOT to design project within budget <br /> <br />January 2008 Prepared by The Tinklenberg Group <br />