Laserfiche WebLink
<br />2008 Work Plan Highlights - <br />Priority Project <br />• Additional/Third Lane on Highway 10 from <br />Egret Blvd. to Hanson Blvd <br />• Mn/DOT has earmarked $9.4 million over a <br />three-year period to design and construct <br />additional lane in both directions <br />• Cost estimates to construct at optimal design <br />standards total $12.5 - ~ 13 million. <br />January 2008 Prepared by The Tinklenberg Group <br />