Laserfiche WebLink
Case File: P 07-OS <br />Page 5 <br />Utilities <br />Water/sanitation -The subject lot is not within the urban service area; therefore each of these <br />buildings would need an on-site sewer system and private well. Currently Lots 1 and 2 will have <br />their own well and Lots 3 and 4 share a well. Each lot will have their own septic systems. Cross <br />access agreements are necessary for the shared systems. <br />Storm Sewer/water -There are two drainage ponds constructed for the four lots. It may be <br />necessary to expand the ponding if Lot 2 is developed. Drainage and utility easements should be <br />placed on the ponds. <br />Respectfully Submitted <br />3 <br />Sheila Cartney <br />Senior Planner <br />Action Motion by Second by Vote <br />Follow Up <br />S:\PLANNING\Case Files\Plat\P 07-05 Ar-Mon Commercial 2nd\PC 06.12.07.doc <br />