My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. PCSR 09-11-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2007
>
09-11-2007
>
5.5. PCSR 09-11-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 3:42:28 PM
Creation date
2/1/2008 10:03:21 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-30-2007 00:11 From: stoneworks inc To:7636351090 Paee:2~9 <br />toneworks <br />,.,~„~„r, ARCHITECTURAL PRECAST, ING. <br />7/3U/U7 ;: ,,: <br />Sloneworks Architectural Precasl, Inc. <br />PO Bux 73$ <br />Llk River, MN 5533[1 <br />Attn. Mr..ieremy Barnhart <br />Planning Manager. <br />City of Elk River <br />Re: Conditional Use Permit <br />Jeremy, <br />stoneworks Architectural Precast, lnc, and JT i..~lnd Company have reviewed the leper <br />dal.ed July 17, 2007 regarding the complaiuls related to noise, and use of the access drive <br />from highway .1h9. <br />As you know, the attached conditional use permit approved for .1T I~tnd Comp~my allows <br />the business to operate from 6 am to 6 pm, seven days a week. Also, as described in the <br />"llescriptioil of!'roject", the site surrounding the buildin6 would be used for aggregate <br />storage, precast product. storage, old fortes, forklift operations, and power washing/sand <br />blasting. <br />At t}-is point., Stoneworks and JT Land Company request that our C.IJ.P. be revised to <br />better reflect the current business operationti, and to acknowledge the complaint received. <br />'Therefore, on an interi.nl basis, Stimeworks has already modified our operating; hours <br />outside of the facility for cutting, sandblastins, and power washing to occur from ~ am to <br />G pm. Addit.icmally, we have directed a.ll employees and delivery vehicles not to use the <br />accetis drive lrom highway 169. <br />W~ arc also requesting, on a permanent basis, that the C.U.P be modiffied as foll4wc: <br />1. Hours of Operation: liam - bpm - 7 days a week. <br />P.0. Box 738 ^ Elk River, MN 55330 <br />763.633.2200 ^ Fax 763.6332201 <br />www.stoneworksap.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.