Laserfiche WebLink
JUL-30-2007 00:12 From: stoneworks inc To:7636351090 Pa9e:4~9 <br />Rpr 23 07 08130a p,~p <br />C~'~1~ ~'I~ ~ ~®i~1~R AC~i4 L, ~ iL ~ <br />2f02S Commerce Blvd, Sufte 90o Rogers, MN 55970 p.T63.418.8988 f.T63.4H3.o290 <br />DESCRIPTION OF PROJECT -REVISED 11/17/05 <br />Genoral Information <br />This Conditional Use Permit (CUP) Application is for the construction of a new Steel Engineered <br />Facility on the 10 acre PlabParcel for JT Land Company (Building Owner) and a prECast <br />manufacturing businESS. This parcElcurrently contains one (1) house, two (2) garages and one <br />(1) barn, a dedicated easement for access to TH169, The site is in one zoning category; I-2, <br />Medium Industrial. The Current occupants of the home on the proposed site are employees of <br />Plaisted Companies. These employees have the responsibility of the caretakers of the pit during <br />off hours and maintain safety within the pit during off hours. For this reason JT Land Company <br />and Plaisted Companies requests that the duel usage (residential/industrial) be granted for this <br />$Ite~ <br />11/17/05 Revision - JT Land Company is willing loase the home to Only employees of either <br />Plaisted Companies or the new precast company. <br />Intended _Use -New Facility <br />The intended use of the facility is for precast concrete material production for the building <br />construction industry. The processes occurring within the building enclosure will include but not <br />limited to; wood form building, mixing of concrete, pouring and finishing concrete, pressure <br />washing/sandblasting, stacking of pans and palletizing, loading/unloading trucks, office related <br />functions and some metal fabrication and welding. <br />Buildin Information <br />The building construction will be less than 12,000 square feet. The site surrounding the building <br />will be used for aggregate storage, precast product storagQ prior to shipping, old forms prior to <br />recycling/disposal, forklift operation and power-washing/sandblasting opErations. <br />Em to ee/7raffic/Dellve lnforma ion <br />It is anticipated that approximately six (6) employcES will be on site or within the facility, seven (7) <br />days a week from Gam to 6pm. The conveyance of materials to and from the facility will occur on <br />the common access provided to the site and the adjacent properties to and from Mwy 169 and/or <br />through the Plaisted Companies existing site to the south_ In discussions with Mark Renn of <br />MnDOT - St. Cloud, 2111^ Avenue will remain a right in /right out for the foreseeable future. <br />however, when improvements ere made to Hwy 169 the intersection will be eliminated and acC2SS <br />to these existing properties will have to be provided through a different means from Connections <br />county roads to the west. 711'^ Avenue is not described in a plat and appears to be a city street <br />providing access to the three properties off Mwy 169. Representatives from Christian Commercial <br />and JT Land Company will be meeting with Mr. Renn prior to the Planning and Zoning meeting on <br />Novembor 22nd and will submit additional information for consideration at that time. <br />