My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. PCSR 09-11-2007
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2007
>
09-11-2007
>
5.5. PCSR 09-11-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2008 3:42:28 PM
Creation date
2/1/2008 10:03:21 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christian Commercial/1T Land Company/CLT 05-26 <br />December 19, 2005 Page 2 <br />Overview <br />Existing Conditions <br />The facility is proposed to be located on a 10 acre site. There is currently a residence, three <br />accessory buildings and a silo on the property. The residence is occupied by employees of <br />Plaisted Companies; they are caretakers of the mining pit during off hours. The property <br />shares an access from Highway 169 with two adjacent residences. The site is a mix of woods <br />and open area. The northwest corner of the site is wooded. The properties to the south and <br />west are part of the Plaisted mining operation; the properties to the east and north are large <br />lot residences. <br />Proposal <br />Operations <br />The business urill operate from 6AM to 6PM seven days a week. All production will take <br />place inside the building. The applicant has indicated that there will be six employees per <br />shift. <br />Building <br />The applicant is proposing to construct a 1?,000 square foot concrete product <br />manufacturing facility. The building grill be 80' ~ 150'. The exterior of the building will be <br />pre-fuushed metal panels, which are on the acceptable materials list for the I2 district. There <br />are three loading doors, one on the south, north and west sides, and a ser~rice door on the <br />north side. There will be a 10 foot aide concrete pad around the building. There ~~ill be <br />some downcast lights on the outside of the building. No other site fighting is proposed. <br />Access, Parking and Storage <br />Access to the site will be from the south through the Plaisted mining pit. The applicant and <br />the City- have had conversations with MNDOT regarding using the existing residential <br />driveway as a commercial access to this facility. The existing driveway from the north, off of <br />Highway 169, can not be used by this facility-. Per MNDOT, the access can only be used by <br />the current single family residences. The site plan will have to be re`rised to eliminate the <br />connection to the existing driveway from Highway 169. The area around the building will be <br />used for storage of products and employee parking. There is sufficient room available to <br />accommodate parking for the anticipated 6 employees per shift. There are 11 aggregate bins <br />located north of the building. Bobcats will be used to transport aggregate from the bins to <br />the inside of the building. <br />Grading. Drainage and Utilities <br />Grading, drainage and utilities are addressed in the City Engineer's memo. <br />S:\PLANNING\Case FIles\CUP\CU OS-2G Christian Commercial\CU05-200012-19.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.