Laserfiche WebLink
2008 Work Plan Highlights – <br />Priority Project <br />Additional/Third Lane on Highway 10 from <br />? <br />Egret Blvd. to Hanson Blvd <br />Mn/DOT has earmarked $9.4 million over a <br />? <br />three-year period to design and construct <br />additional lane in both directions <br />Cost estimates to construct at optimal design <br />? <br />standards total $12.5 -$13 million. <br />4 <br />January 2008Prepared by The Tinklenberg Group <br />