Laserfiche WebLink
Priority Project/Third Lane Efforts <br />Work with Mn/DOT to determine bus shoulder <br />? <br />lanes, phasing of bridge construction over the <br />railroad, and other design standards <br />Determine how additional costs will be fund <br />? <br />Local matching funds, federal appropriations request, <br />– <br />other sources <br />Ensure no funds are lost due to timing constraints <br />? <br />for using state dollars <br />Assist Mn/DOT to design project within budget <br />– <br />5 <br />January 2008Prepared by The Tinklenberg Group <br />