Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />6.) Reclamation Standards <br /> <br />a. Schedule: <br /> <br />Reclamation will occur upon completion of mining activity. <br />Reclamation will be completed within one year of final <br />extraction activity. <br /> <br />b. Slopes: <br /> <br />Slopes will be reclaimed in accordance with the reclamation <br />plan. Finished slopes will not exceed 4: 1. <br /> <br />c. Cover and Planting: <br /> <br />A minimum of 3" of topsoil will be placed over reclaimed slopes. <br />The slopes will be seeded in accordance with the reclamation <br />plan. The vegetation will be periodically inspected to insure that <br />it has become self-sustaining. <br /> <br />d. Slopes to Water Bodies: <br /> <br />There will be no created water bodies on this site. <br /> <br />e. Water Bodies: <br /> <br />All water bodies resulting from extraction - for example <br />temporary storm water ponding areas, will be removed as part <br />of final reclamation. <br /> <br />IV CERTIFICATION <br /> <br />I hereby certify that this plan, specification of <br />report was prepared by me or under my direct <br />supervision and that I am a duly Registered <br />Engineer and duly Registered Geologist under <br />the laws of the State of Minnesota. <br /> <br />Kirsten Pauly, PE, PG <br />Reg. No.21842 Date 8/31/06 <br /> <br />Page 1 0 of 1 0 <br />