My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 08-20-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/20/2007
>
6.4. SR 08-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/17/2007 1:49:14 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />5.) <br /> <br />Operating Standards: <br /> <br />a. Noise: <br /> <br />The mining operation will be operated in compliance with all <br />State noise standards. <br /> <br />b. Hours: <br /> <br />Mining and crushing will be conducted between 7:00 a.m. to <br />7:00 p.m. Monday - SCiiturday. <br /> <br />c. Explosives: <br /> <br />There will be no explosives used at this site. <br /> <br />d. Fugitive Dust: <br /> <br />Fugitive dust will be minimized by hard-surfaced roads, recessed <br />operations, and use of conveyors. Internal haul roads will be <br />watered as needed. Fugitive dust will not exceed air pollution <br />standards established by the Minnesota Pollution Control <br />Agency. <br /> <br />e. Water Pollution: <br /> <br />The site will be operated in compliance with all applicable <br />Minnesota Pollution Control Agency and Department of Natural <br />Resources standards. A National Pollution Discharge Elimination <br />Permit (NPDES) will be obtained for the site. Any fuel storage <br />on site will be in approved, double-walled storage tanks. <br /> <br />f. Topsoil: <br /> <br />All topsoil will be retained on the site until the completion of <br />restoration. Topsoil will be used to create screening berms. The <br />berms will subsequently be removed as part of the reclamation <br />process. <br /> <br />g. Slopes: <br /> <br />The active mining face yvill be sloped at approximately 1.5: 1. <br />Reclaimed slopes will b$ backfilled to a maximum slope of 4: 1 <br /> <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.