My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 08-20-2007
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2007
>
08/20/2007
>
6.2. SR 08-20-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:37:05 AM
Creation date
8/17/2007 10:09:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Downtown Redevelopment Plan Task Force Minutes ', <br />March 5, 2007 <br />Page 3 <br />• MnDOT has placed higher priority on Hwy 169 over Hwy 10. <br />• Traffic counts on Hwy 169 are estimated. to be double the amounts on Hwy 10 in <br />the year 2025. <br />• Even if $21 million (2001 dollars)'',suggested by the IRC results is spent on elevating <br />Hwy 10 downtown, MnDOT's LQVeI of Service will still be an"F". <br />• The Tinklenberg Group will submit a 3rd request for $500,000 of Federal funding <br />to further analyze Hwy 10 through the downtown area. <br />• Terry Humbert, MnDOT Project''Manager for Hwy 10 has indicated that there is no <br />funding in MnDOT's 30 yr. plan for Hwy 10 downtown. <br />• Scott Bradley, MnDOT Chief Landscape Architect stated that it would be Terry <br />Humbert's decision whether or not to bring the Context Sensitive Design group at <br />MnDOT into Elk River to enhance Hwy 10 improvements. (NIr. Maurer suggested <br />that this may be an option if the $500,000 of Federal funding was awarded to <br />further study Hwy 10 downtown.) <br />Member Holme asked if traffic issues alotxg Hwy 10 downtown are going to get worse <br />within the next fifteen years if nothing is cone. Mr. Maurer stated "yes" according to <br />MnDOT's projections. He expanded with'', the following: <br />• There is no funding available for thirty years; however MnDOT's 30-year plan may <br />change. <br />• MnDOT will likely fund improvements in the Anoka/Ramsey area prior to funding <br />improvements to Hwy 10 downtown. <br />• MnDOT District 3 will fund Hwy 169 projects prior than Hwy 10 projects. <br />Member Dana Anderson asked Mr. Maurer if safety issues would motivate MnDOT to make <br />improvements to the highway even though the Level of Service would still be rated an "F." <br />Mr. Maurer stated that most reported deaths occur on 2-lane undivided highways and <br />Highways 10 and 169 are considered relatively safe highways. <br />Conceptual Options I <br />For the purposes of Task Force policy discussions, Mr. Maurer provided an overview of the <br />following four conceptual options: I, <br />• Lower highway <br />• Elevate highway <br />• Elitninate one intersection <br />• Do nothing <br />Mr. Maurer expanded on the "eliminate o1~e intersection" option explaining that this option <br />may be the fastest way to improve traffic Since eliminating an intersection is more cost <br />effective than lowering or elevating a highway. <br />Planner Chris Leeseberg presented animated images of how Hwy 10 would appear to <br />travelers both from a lowered and elevated perspective. He also presented a still image of <br />how local traffic may be realigned if one intersection in the downtown area were to be <br />eliminated. He used the example of eliminating the Main Street/Hwy 10 intersection. He <br />reiterated that the images were concepts, not designs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.