Laserfiche WebLink
<br />. <br /> <br />Microwave back-up alarms or equivalent <br />alternative technology shall be used as <br />determined necessary by staff. <br /> <br />A turnaround will be provided within the pit so <br />that trucks not equipped with microwave back-up <br />alarms will not need to back-up. <br /> <br />d. Fifty-five (55) decibels at the site's west and <br />south property lines is the noise level standard <br />that shall be adhered to at all times by the <br />operator. <br /> <br />c. <br /> <br />b. <br /> <br />(20) Hours of Operation. <br /> <br />All mineral excavation and processing activities <br />shall be conducted between the hours of 7:00 a.m. and 7:00 <br />p.m., Monday through Saturday. Increased hours shall <br />require an amendment to this Conditional Use Permit and <br />cannot be requested the first year of this Conditional Use <br />Permit. <br /> <br />. <br /> <br />(21) Lighting. <br /> <br />Lighting from the operation shall be directed away <br />from public right-of-way and nearby or adjacent residential <br />property. Glare, whether directed or reflected as <br />different from general illumination, shall not be visible <br />from beyond the limits of the immediate site. All sources <br />of artificial lights shall be so fixed, directed, designed, <br />or sized, that the minimum subtotal of their illumination <br />shall not increase the level of the illumination on any <br />nearby residential property for more than .1 foot candles <br />in or within 25 feet of a dwelling or more than .5 foot <br />candles on any part of the property. <br /> <br />(22) The piling, storing or keeping of old machinery, <br />junk, debris, or abandoned motor vehicles, shall be <br />prohibited on the site. <br /> <br />(23) Mining activities shall not cause excessive vibration <br />off-site. <br /> <br />(24) Mechanism for responding to complaints. <br /> <br />a. Representatives of the Shiely Company shall make <br />themselves available to address complaints. A <br />plan to deal with the complaint shall be <br />developed and implemented. Shiely will also <br />follow-up with the complainant and all <br />appropriate documents copied to the City within <br />one (1) week. <br /> <br />. <br /> <br />a. <br /> <br />. . d <br /> <br />'0'01 ...I'SI'.0 <br /> <br />S9~~968-~19 H3~9aHl' o'~a H~W"OH Hl~~~' WO~, <br />