My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 09-19-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
09/19/1994
>
7.1. SR 09-19-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:55 AM
Creation date
5/23/2007 1:46:33 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/19/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />e. The first 100 feet of the access road prior to <br />County Road 33 shall be paved to minimize dust. <br /> <br />(16) Traffic. <br /> <br />a. All traffic associated with the operation shall <br />only use County Road 33 back and forth to U.S. <br />Highway 169. Except for localized jObs, no <br />traffic from this operation shall use Proctor <br />Avenue or County Road 33 to the west of the <br />site. A map shall be prepared by City staff <br />that defines localized jobs. Shiely shall post <br />notice of these requirements at the exit from <br />their site. Failure to control traffic from <br />this operation shall constitute a violation of <br />this Conditional Use Permit. <br /> <br />. <br /> <br />d. <br /> <br />b. An acceleration and by-pass land shall be <br />constructed at Shiely'S expense and on right-of- <br />way they dedicate to Sherburne County pursuant <br />to the specifications of the Sherburne County <br />Engineer, prior to hauling activities <br />conunencing. <br /> <br />c. The location of the access to the site shall be <br />determined by the Sherburne County Engineer. An <br />access permit from Sherburne County may be <br />required of the operator. <br /> <br />The operator Shall reimburse Sherburne County <br />for abnormal wear on (damage caused by other <br />than traffic flow that the road was designed to <br />handle) haul roads that is caused by the <br />operation. <br /> <br />(17) The berm along County Road 33 identified in the <br />operator's plans, shall be constructed to act as a visual <br />screen of the operation. This berm shall be built and <br />landscaped within the first year of the mines operation <br />according to a landscaped plan approved by staff. <br /> <br />(18) Wash water used in the operation shall be recycled in <br />a two pond system allowing for sedimentation. <br /> <br />(19) Noise. <br /> <br />a. Noise from screening and crushing associated <br />with this operation shall be controlled by <br />location on the site, the placement of <br />stockpiles, type of equipment and ultimately by <br />placing them in soundproof buildings, if <br />necessary as determined by staff. <br /> <br />. <br /> <br />7. <br /> <br />a . d <br /> <br />~0'01 1'661',1'60 <br /> <br />,9~~96a-~19 N3~aON[1 "l~O N~N"ON N[~~~l NO~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.