Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />3. <br /> <br />. <br /> <br />2, <br /> <br />Site grading at the Park & Ride facility is difficult to estimate on a unit basis. <br />Therefore, it is proposed to accomplish this work on a time and material basis. The <br />Contractor is obligated to import material from the School Street project as part of <br />that project's cost, however, he should be compensated for the time and equipment <br />needed to place the material for purposes of construction of the Park & Ride. <br />Following is a list of equipment and hourly rates. It is anticipated that the total cost <br />of this grading will fall in the range of $3,000 to $5,000. <br /> <br />EQUIPMENT RATES FOR GRADING WORK (OPERATED RATES) <br /> <br />Foreman w/pickup <br />Tandem dump truck <br />D3 dozer <br />D6 dozer <br />Bobcat . <br />Cat 950 loader <br />Cat 140 blade <br />Cat 613 scraper <br />Smooth drum roller <br />Turf tractor <br />Low boy tractor-trailer <br /> <br />$58.00/hr. <br />50,OO/hr. <br />70.00/hr. <br />78.00/hr. <br />42.00/hr. <br />80,00/hr. <br />78.00/hr. <br />80.00/hr. <br />75.00/hr. <br />42.00/hr. <br />95. OO/hr. <br /> <br />Cost of material for each of the six hydrant installations on School Street is <br />$1,403.00, Therefore, the total change order for all six hydrants is $8,418.00. <br />