My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 08-01-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
08/01/1994
>
5.2. SR 08-01-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:51 AM
Creation date
4/19/2007 8:53:45 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />FILE: 230-216-30 <br /> <br />CHANGE ORDER NO. 1 <br />SUPPLEMENTAL INFORMATION <br /> <br />DESCRIPTION: <br /> <br />This Change Order to the Forest Lake Contracting Contract for the construction of School <br />Street, Jackson and Freeport Avenues. Involves adding work associated with a construction <br />of a Park & Ride area on the old City Hall site located at the intersection of TH 10 and Main <br />Street. The construction involves concrete curb and gutter, gravel base, bituminous <br />surfacing, removal of miscellaneous concrete and bituminous, and grading of the site. In <br />addition, this change order also deals with the salvaging and installing of six new hydrants <br />on School Street. The original intent of the specifications was to salvage the existing <br />hydrants, and to provide them to the municipal utilities and have the Contractor install new <br />equipment. It is obvious from the Contractor's bid that his interpretation was to remove and <br />reinstall the existing equipment. Therefore, he has requested additional compensation in the <br />amount of the cost of the new equipment to be installed. <br /> <br /> The following three areas breakdown the components of this change order: <br />. L Construction of the Park & Ride facility. <br /> Item Unit Total <br /> N.o... Item llnit .Ql}' .erice .erice <br /> I Concrete curb and gutter, B612 LF 1,076 $ 7.75 $ 8,339.00 <br /> 2 Concrete sidewalk SF 575 2.50 1,437.50 <br /> 3 Pedestrian ramps EA 2 125.00 250.00 <br /> 4 Aggregate TON 561 6.00 3,366.00 <br /> 5 Bi tuminous base TON 230 23.00 5,290.00 <br /> 6 Bituminous wear TON 128 32.00 4,096.00 <br /> 7 Tack coat GAL 93 2.00 186,00 <br /> 8 Pavement mark, 4" solid white line LF 456 0.85 387.60 <br /> 9 Blue handicap symbol EA 3 35,00 105,00 <br /> 10 Rip-rap Class 3 CY 4 60,00 240.00 <br /> 11 Man-hole adjustment LS 1 500.00 500_00 <br /> 12 Silt fence LF 40 2.00 80.00 <br /> 13 Sodding SY 485 2.00 970.00 <br /> 14 Remove bituminous pavement SY 267 1.75 467.25 <br /> 15 Sawcut bituminous pavement LF 30 1.75 52.50 <br /> 16 Remove concrete curb and gutter LF 40 1.50 MOO <br />. ESTIMATED TOTAL COST $25,826.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.