Laserfiche WebLink
<br />. <br />. <br />. <br /> <br /> <br />. <br />. <br />. <br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />~ 1r- - .''''~i j <br />\ \ .flY ,! <br />It t!}~~-' . <br />r. "" 1J' i...i~,., .- <br />~: ~ .\L~ <br /> <br /> <br />r-- <br /> <br />Pr1ed Proposal <br /> <br />c <br /> <br />r-~ <br /> <br />2. Anticipated technology in this type of building includes phone systems, a <br />paging system, audio systems for individual rooms, emergency call buttons <br />throughout the public fitness area, video capabilities, etc. The Owner typically <br />provides the equipment and the design team will provide documentation for its <br />proper installation. <br />3. This design team is prepared to provide construction documents in July. <br />Achieving this goal will rely heavily on starting where the pre-project planning <br />ended. See proposed project schedule on the following page. Meeting this <br />schedule will naturally require a well-structured, decision-making process and <br />we are prepared to organize project information to assist you in this regard. <br />4. It appears the project has been carefully studied with regards to the proposed <br />project budget. Our experience shows that for a new branch facility, <br />construction costs typically equate to 75%-80% of the project cost. This <br />would mean a construction cost of approximately $9.25 million. <br /> <br />Below is our preliminaty evaluation of the types of the construction involved <br />and the costs for the primary spaces in this building (using the pre-project floor <br />plan and added gymnasium space). <br /> <br />Average <br />Construction <br /> <br />avg. cost/s.f. <br /> <br />Cost <br /> <br />. Fitness/Studio <br />. Locker Rooms <br />· Gymnasium <br />· Aquatics <br />· Kids Zone <br />. Office/Community <br />Room/Member Services <br /> <br />15,600 g.s.f. <br />6,600 g.sJ. <br />8,600 g.sJ. <br />12,000 g.sJ. <br />5,000 g.sJ. <br />7,600 g.sJ. <br /> <br />x $140/s.f. <br />x 240/sJ. <br />x$115/s.f. <br />x $21 O/sJ. <br />x $140/sJ. <br />x $130/sJ. <br /> <br />$2,200,000 <br />$1,600,000 <br />$1,000,000 <br />$2,500,000 <br />$700,000 <br />$1,000,000 <br /> <br />55,400 g.sJ. <br /> <br />. Splash Deck <br /> <br />$150,000-$250,000 <br /> <br />Construction Cost <br /> <br />$9.1-$9.3 million <br /> <br />These construction costs would appropriately align with past new Minneapolis <br />YMCA branch facilities for level of construction detail and finish quality of <br />both interior and exterior materials. Exterior materials likely will include a <br />brick, prefinished metal paneling and upgraded exterior pre-cast wall panels. <br />Interior finishes include proper athletic/fitness floorings, extensive tile finishes <br />in the aquatic and locker rooms areas, durable finish types on other interior <br />surfaces, lighting controls, advanced energy management control systems, etc. <br /> <br />Proposal for Architectural and Engineering Services I Elk River YMCA l January 2007 ! 35 <br /> <br />~ <br />BWBR <br />~1/ <br />