Laserfiche WebLink
<br /> <br />40,000 s.f. facility, second floor <br />~~ <br /> <br />1111 <br />1111 FllJIESSGNlER <br /> <br /> <br />Of'ENTO <br />N-'T.'TORIUM <br /> <br />1111 <br />uuuuuu <br />muuu <br /> <br />~ <br /> <br />YMCA of Metropolitan Minneapolis: <br />Prototype Facilities Planning · Minneapolis Metro Area, MN <br /> <br />· Completion date: 2005 <br />· Total square footage: Generic 40,000 sJ., 60,000 s.L <br />and 80,000 sJ. facility concept plans <br />· Proiect designer: BWBR Architects <br />· Proiect manager: Greg Fenton <br />· Principal in charge: Steve Patrick <br /> <br />· BWBR was commissioned to develop prototype programs for 40,000 sJ., <br />60,000 sJ., and 80,0000 sJ. YMCA facilities. Oeliverables included a proposal- <br />style book and Power Point presentation with prototype examples that the <br />YMCA can present as marketing tools to various audiences. <br /> <br /> <br />80,000 s.f. facility, first floor <br /> <br />60,000 s.f. facility, second floor <br /> <br /> <br />OI'E1iTQ <br />r<<r^rotlIVM <br /> <br />1111 <br />1111 = <br />1111 <br />uuuuuu <br />uuuuuu <br /> <br />Ol'Er-lro <br />""" <br /> <br />~ <br />~ <br /> <br />\,lPEN TO K,I)~ <br />"'DVEN~EZONE <br /> <br />"""" -, <br />m.tOlO STlJOlO <br /> <br />80,000 s.f. facility, second floor <br /> <br /> <br /> <br />14: Proposal for Architectural and Engineering Services i Elk River YMCA i January 2007 <br /> <br />~. <br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />