Laserfiche WebLink
<br />Page 1 of 1 <br /> <br />Cartney, Sheila <br /> <br />From: Chris Gale [cbgale@up.net] <br />Sent: Friday, December 01, 2006 1:41 PM <br />To: Cartney, Sheila <br />Cc: 'Steinbeck, Tim GRE/ER' <br />Subject: STCC Elk River_Verizon Wireless CUP_Site Sketch & Photo Sim <br />Attachments: Sim_tinal-2nd .jpg; STCC _ELK RIVER_ SS(VA L 12-01-06. pdt <br /> <br />Sheila: Attached please find the revised site sketch and revised photo simulation <br />showing the proposed Verizon Wireless equipment shelter placed on the Steam Plant <br />Extension building. The HV AC units are now on the North side of the equipment <br />shelter. In addition, two supporting columns have been added to the stairway and <br />walkway. Visually, the effect of these changes will be to make the addition less visible <br />from Highway 10. This change is required to meet structural engineering requirements. <br /> <br />I will be at the Conditional Use Hearing scheduled for December 12, 2006, to answer any <br />questions. Please emaillcall with any questions in the interim. <br /> <br />Thanks, Chris. <br /> <br />Christopher Gale <br />Buell Consulting, Inc. <br />54410 Old County Road <br />Calumet, MI49913 <br />Ph. 906-281-2161 <br />FAX 906-337-5276 <br />email: cbgale@up.net <br /> <br />12/1/2006 <br />