Laserfiche WebLink
<br />PARKING. GRE will provide a single stall for use of the site technicians while <br />servicing equipment. This space is within the parking area currently used by GRE <br />employees at the Steam Plant Building site. The underlying lease agreement with GRE <br />provides for ingress and egress to the site. Parking requirements will not change from <br />those currently in use. <br /> <br />SCREENING. There will be no screening of the site. The building will be situated <br />within the Steam Plant Complex and will be similar in appearance to the existing <br />buildings. There are pine trees planted to the Southwest of the site, and these will <br />provide screening to persons traveling from the South on Highway 10. There will be a <br />relatively narrow line of sight from the Highway 10 roadway, whether going North or <br />South, in which a traveler will be able to clearly see the proposed equipment shelter, <br />since Highway 10 is considerably lower in elevation than the equipment shelter. The <br />shelter will be in a location where no new skyline views will be created. <br /> <br />BUILDING MATERIALS. The building is an engineered building, designed <br />specifically tor telecom use. Final plans will be signed by an architect and structural <br />engineer licensed in Minnesota. The exterior will be a galvanized embossed stucco <br />finish, which will weather to a flat gray to match the surrounding structures. Full <br />Specifications are included with this application. <br /> <br />SIGNAGE. There are three signs affixed to the entry door on the equipment shelter. <br />Two of the signs are the required HazMat signs, and the third is a sign with the site name <br />and emergency contact number. <br /> <br />OUTDOOR STORAGE. There will be no outdoor storage. <br /> <br />SITE IMPACTS. Site impacts are minimal. Part of the parking lot area will be utilized <br />for stairway support. No trees will be cut. No changes to the existing Steam Plant <br />Building Extension will be required beyond the structural supports for the equipment <br />shelter and stairway. A small area (3' X 3')ofthe parking lot will be cut to place a <br />footing for the stairway, and will be patched as required. <br /> <br />UTILITIES. A microwave link will provide telco service to the site, in the same <br />manner in which it currently is provided. Power will be obtained on-site. No water or <br />sewer service is required. <br /> <br />EA W/EIS. Not required for this site. <br /> <br />Please call me at 906-281-2161 with any questions. <br /> <br />Thank~OU' <br />(] ~. v-,1?/~ <br /> <br />Christopher ale q <br />Buell Consulting, Inc. <br />Agent for Verizon Wireless <br />