My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.A. SR 12-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/18/2006
>
6.1.A. SR 12-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:43 AM
Creation date
12/15/2006 9:09:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />expenses. Past City practices with similar types of projects will be used as a guideline to <br />discuss financing methods for the proposed improvements. <br /> <br />III. NECESSITY AND COST-EFFECTIVENESS <br /> <br />The improvements proposed in this study are necessary for a number of reasons. The <br />reconstruction of the streets is a cost-effective means of continuing the City's proactive <br />street efforts and ensuring an adequate means of transportation for local residents. In <br />addition to rehabilitating street pavement, a total street reconstruction will allow for the <br />correction of existing drainage problems through the construction of concrete curb and <br />gutter, modifying street grades, and the installation of an improved storm sewer <br />collection system. The watermain improvements are necessary due to under sized <br />mains and deteriorating materials which result in inadequate water flow and potential <br />leaks. <br /> <br />The proposed improvements will provide a project large enough to ensure a competitive <br />bidding environment and therefore will be cost-effective. Based on the information <br />contained within this report, the proposed improvements are necessary, cost-effective, <br />and feasible from an engineering standpoint. <br /> <br />IV. EXISTING CONDITIONS <br /> <br />Street <br /> <br />Below is a table summarizing the existing street conditions including information <br />regarding street length, width, curb & gutter, and sidewalk. <br /> <br /> <br />Irving Avenue 350 36-42 Yes Both Sides <br />(4th to 5th) <br />Irving Avenue 1730 30-40 No One Side <br />(5th to School) <br />5th Street 365 30-38 Partial No <br />(Irving to Jackson) <br />5th Street 270 32 No No <br />(Irving to Holt) <br />5th Street 590 28 No No <br />(Holt to Gates) <br />5th 1/2 Street 590 28 No No <br />(Holt to Gates) <br />Holt Avenue 260 28 No No <br />(5th to 5th 1/2) <br />Gates Avenue 260 22 No No <br />(5th to 5th 1/2) <br />6th Street 365 30 No No <br />(Jackson to Irving) <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.