Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I. INTRODUCTION <br /> <br />On October 2, 2006 the City Council adopted Resolution 06-116 ordering the feasibility <br />study for the 2007 Irving Avenue Area Street Rehabilitation Project. The area to be <br />included in the project Includes Irving Avenue from 4th Street to School Street and all <br />intersecting streets as shown in Exhibit 1. In addition, the project will include the paving <br />of the alleys in the area and the milling and overlay of three streets south of School <br />Street also shown in Exhibit 1. <br /> <br />The 2007 Irving Avenue Area Street Rehabilitation Project can be broken down into <br />three groups representing the type of improvement proposed. The first and largest <br />portion of the project includes the reconstruction of streets, sidewalks, storm sewer, and <br />watermain. The second part of the project includes a mill and overlay area where the <br />streets have not deteriorated to a point that merits a complete reconstruction. The third <br />and final part includes the paving of three alley sections. The streets included within the <br />project are listed below: <br /> <br /> <br />Irvin Avenue <br />5th Street <br />5th Street <br />5th Street <br />5th 1/2 Street <br />Holt Avenue <br />Gates Avenue <br />6th Street <br />6th Street <br />7th Street <br />7th Street <br />Gates Avenue <br />8th Street <br />8th Street <br />Holt Avenue <br />Gates Avenue <br />Aile <br />Aile <br />Aile <br /> <br />II. PROJECT SCOPE <br /> <br />4th Street <br />Jackson Avenue <br />Irvin Avenue <br />Holt Avenue <br />Holt Avenue <br />5th Street <br />5th Street <br />Jackson Avenue <br />Irvin Avenue <br />Jackson Avenue <br />Irvin Avenue <br />6th Street <br />Jackson Avenue <br />Holt Avenue <br />8th Street <br />8th Street <br />5th Street <br />6th Street <br />7th Street <br /> <br />School Street <br />Irvin Avenue <br />Holt Avenue <br />Gates Avenue <br />Gates Avenue <br />5th 1/2 Street <br />5th 1/2 Street <br />Irvin Avenue <br />Gates Avenue <br />Irvin Avenue <br />Gates Avenue <br />7th Street <br />Irvin Avenue <br />Gates Avenue <br />School Street <br />School Street <br />6th Street <br />7th Street <br />8th Street <br /> <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Reconstruction <br />Mill & Overla <br />Mill & Overla <br />Mill & Overla <br />Overla <br />Overla <br />Overla <br /> <br /> <br />The purpose of this study is to analyze the necessity for improvement of the proposed <br />streets and alleys included in the 2007 Irving Avenue Area Street Rehabilitation Project. <br />In addition, the existing sanitary sewer, water, and storm sewer systems will be <br />evaluated to determine the necessity for improvements. The study will discuss the <br />existing conditions, proposed improvements, estimated construction costs, and <br />overhead costs which include city administration, engineering, fiscal, and legal <br /> <br />1 <br />