Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Irving Avenue Area Informational Meeting <br />December 7, 2006 <br /> <br />A: <br /> <br />Q: <br /> <br />A: <br /> <br />A: <br /> <br />Q: <br /> <br />A: <br /> <br />Q: <br /> <br />Page 2 <br /> <br />reconstructed also. The curb and gutter not only finishes the product, but provides <br />a conduit for storm drainage to the catch basin and into the pipe system. The curb <br />and gutter is an integral part of an urban street section. <br /> <br />Q: <br /> <br />Will there be significant changes to the street grades? <br /> <br />A: <br /> <br />We don't anticipate any major changes in the street grade, however, the streets will <br />likely be dropped slightly overall to allow room for the six-inch barrier curb at the <br />edges. - <br /> <br />Q: <br /> <br />Will the contractor be willing to do private driveway work? <br /> <br />A: <br /> <br />That is a question we will pose to the contractor once we have the low bid. Many <br />contractors are willing to do private driveway work. Some are not. The newsletter <br />that we send out before the project starts will give you the answer to that question. <br />If the contractor is willing to do that work. we will provide a contact to get a quote. <br />If you want to get a quote for driveway work, our inspector will work with you to <br />determine how much of your driveway will be replaced at the project cost. Then you <br />can get a quote for the remainder of the work from the contractor. The City will <br />help facilitate the contractor and property owner getting togetherrbut the City will <br />not be party to any private driveway work contract. <br /> <br />Q: <br /> <br />Is the project a done deal at this time? <br /> <br />A: <br /> <br />The project is not a done deal until the Council approves the project and authorizes <br />the award of the contract to the contractor. <br /> <br />Q: <br /> <br />When trees are removed, will they be replaced? <br />~ -. . <br /> <br />It has been the City's policy to try to minimize the removal of any mature trees in <br />the boulevard area. however, when it is necessary to remove vegetation within the <br />public right-of-way, it has been the City's policy not to replace it. <br /> <br />Are the plans to install additional catch basins? <br /> <br />Yes, and the exhibit from the PowerPoint was presented again. <br /> <br />Q: <br /> <br />Will the driveways be replaced with the kind of material that a homeowner has, <br />either concrete or bituminous? <br /> <br />Yes, we will replace bituminous by making a saw cut butt joint and concrete will be <br />replaced with concrete. We will attempt to go back to the joint, however, if there <br />are large concrete panels, it may be necessary to cut them and create a new joint. <br />-- - - . . - <br /> <br />Will sidewalk go around trees? <br /> <br />Wherever it is possible, the sidewalk will be moved to save trees. <br /> <br />How will the project affect the school (this was asked by a representative of St. <br />Andrew's Schoo~. <br />