My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.A. SR 12-18-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
12/18/2006
>
6.1.A. SR 12-18-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:43 AM
Creation date
12/15/2006 9:09:34 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 <br /> <br />Project Cost Estimate <br /> <br />Street & Storm Sewer Improvements <br />Watermain Improvements <br />Total Construction Cost <br /> <br />$ 2,244,100 <br />$ 278,400 <br />$ 2,522,500 <br /> <br />Administration, Engineering, Fiscal, & Legal (28%) <br />Contingency (5%) <br />Total Project Cost <br /> <br />$ 706,300 <br />$ 126,200 <br />$ 3,355,000 <br /> <br />X. FINANCING AND ASSESSMENTS <br /> <br />The improvements discussed in this report are proposed to be financed through a <br />number of different methods. Benefiting properties would be assessed on a per unit <br />basis for street, curb and gutter, sidewalks, storm sewer, and street lighting. A <br />residential lot that could not be further subdivided would be assessed as one unit. Lots <br />that can be subdivided would be assessed as multiple units as appropriate. Churehes <br />and other non-residential property would be assessed as multiple units determined by <br />the lot area. The number of assessable units is approximately 126 for the reconstruction <br />areas, 28 for the alley areas, and 30 for the mill and overlay area which is graphically <br />shown in Exhibit 9. The proposed assessment rate is $6,650.00 per unit for areas <br />where complete reconstruction is proposed, $500.00 for the alley areas, and $1,950.00 <br />for the mill and overlay areas. The total assessment amount would then be $910,400. <br /> <br />The Elk River Municipal Utilities would be responsible for funding all water <br />improvements, including construction cost plus associated overhead. The water <br />improvements are estimated at a total project cost of $370,200. <br /> <br />Based on the estimated total project cost of $3,355,000, total assessments of $910,400 <br />and Elk River Municipal Utilities contribution of $370,200, the remaining project cost to <br />be funding by the City is $2,074,400. <br /> <br />XI. PROJECT SCHEDULE <br /> <br />Informational Meeting <br />Feasibility to City Council <br />Public Hearing <br />Plans and Specifications Ordered <br />Prepare plans and Specifications <br />Walk Through with Residents <br />Plans and Specifications Approved by Council <br />Advertise for Bid <br />Assessment Hearing <br />Bid Awarded <br />Begin Construction <br />Construction Substantially Complete <br /> <br />December 7, 2006 <br />December 18, 2006 <br />February 5, 2007 <br />February 5, 2007 <br />February 2007 <br />Spring 2007 <br />Spring 2007 <br />March/April 2007 <br />April 2, 2007 <br />April 2007 <br />May 2007 <br />Fall 2007 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.