Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />" <br /> <br />- <br />i <br /> <br />, . <br /> <br />June 14, 1994 <br />230-215-30 <br /> <br />Change Order No. 1 - Cost Breakdown <br /> <br />Increase boring casing pipe from 24" to 30" for watermain, and <br />from 20" to 30" for sanitary sewer for. a cost of $18.75/LF <br />material and $20.00/LF labor for a total of $38.75/LF total. <br /> <br />Watermain <br />Bid Item 2.14 <br />Bore 24" Casing Pipe 155 LF @ $38.75 = $6,006.25 <br />Sanitary Sewer <br />Bid Item 3.40 <br />Bore 20" Casing Pipe 190 LF @ $38.75 = $7,362.50 <br />TOTAL $13,368.75 <br /> <br />215-1512.JUN <br />