My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 07-05-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
07/05/1994 - SPECIAL
>
5.3. SR 07-05-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:40 AM
Creation date
10/20/2006 2:34:12 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />CHANGE ORDER <br /> <br />(Instructions on reverse side) <br /> <br /> <br />e PROJECT: <br /> <br />No. <br /> <br />1 <br /> <br />Trunk Sanitary and Water <br />Elk Park Center <br /> <br />DATE OF ISSUANCE: June 14, 1994 <br /> <br />OWNER: <br />(Name, <br />Address) <br /> <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />OWNER's Project No. 230-215-20 <br /> <br />CONTRACTOR: <br /> <br />ENGINEER: <br />MSA Consulting Engineers <br />1326 Energy Park Drive <br />st. Paul, MN 55108-5202 <br /> <br />CONTRACT FOR:Trunk Sanitary and Water <br />Elk Park Center <br /> <br />ENGINEER's Project No. <br /> <br />230-215-20 <br /> <br />You are directed to make the following changes in the Contract Documents. <br /> <br />Description: Increase boring casing pipe from 24" to 30" on watennain, and from <br />20" to 30" on sanitary sewer. At a price of $38.75 per linear foot for material <br />and all labor. <br /> <br />Purpose of Change Order: Increase casing size to allow for man entry, and rock <br />removal, as necessary. <br /> <br />Attachments: (List documents supporting change) Cost Breakdown <br /> <br />e <br /> <br />CHANGE IN CONTRACT PRICE: <br /> <br />CHANGE IN CONTRACT TIME: <br /> <br />Original Contract Price <br /> <br />Original Contract Time <br /> <br />$ <br /> <br />510,897.71 <br /> <br />75 <br /> <br />days or date <br /> <br />Previous Change Orders No.~ to No.O <br /> <br />Net change from previous Change Orders <br /> <br />$ <br /> <br />o <br /> <br />o <br /> <br />day. <br /> <br />Contract Price prior to this Change Order <br /> <br />Contract Time Prior to this Change Order <br /> <br />$ <br /> <br />510,897.71 <br /> <br />75 <br /> <br />day. or date <br /> <br />Net Increase of this Change Order <br /> <br />Net Increase of this Change Order <br /> <br />$ <br /> <br />13,368.75 <br /> <br />o <br /> <br />Contract Price with all approved Change <br />Orders <br /> <br />Contract Time with all approved Change <br />Orders <br /> <br />$ <br /> <br />524,266.46 <br /> <br />75 <br /> <br />days or date <br /> <br />e <br /> <br />Owner <br /> <br />~ <br />B - <br />C ntractor <br /> <br />RECO~NDED: <br /> <br />BY.~~ <br /> <br />APPROVED: <br /> <br />By <br /> <br />EJCOC No. 1910-8-8 (1983 <br />Edition I <br /> <br />21S-1S12.jun <br />
The URL can be used to link to this page
Your browser does not support the video tag.