My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.4. SR 07-05-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
07/05/1994 - SPECIAL
>
6.4. SR 07-05-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:37 AM
Creation date
10/10/2006 3:26:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/5/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Mr. Steve Ach <br />June 15, 1994 <br />Page Five <br /> <br />D. Sanitary Sewer and Water <br /> <br />1. The proposed layout of the sewer and water provides for these utilities to flow <br />through the center of Block 2, anticipating extension further north along this <br />alignment for additional commercial development. This proposal is in lieu <br />of keeping the utilities within Evans A venue right-of-way and then requiring <br />additional lateral extensions into each commercial development to provide <br />access to the buildings. This seems like a reasonable approach although, as <br />mentioned previously, easements will be required over Block 2 to provide <br />City access. <br /> <br />2. As shown on the plan, the watermain needs to be looped to the east to the <br />existing watermain in Hillside Estates. An easement will be required through <br />the outlot just north of Lot 1, Block 1, Hillside Estates Addition. <br /> <br />3. The sanitary sewer, which goes partially around the large commercial <br />building site in Block 2, should be considered a private service line. <br /> <br />e <br /> <br />4. <br /> <br />It is anticipated that the main north-south extension of watermain would be <br />12 inches in diameter and the loop to the east would be 8 inch line. <br /> <br />5. The actual depth of the sanitary sewer would be analyzed ata future date to <br />provide enough depth and capacity for service of property to the north. <br /> <br />E. Landscape Plan <br /> <br />1. Landscaping behind the commercial building in Lot 1, Block 2, is actually off <br />of the project site and falls in the rear of Lots 1, 2, and 3 of Hillside Estates <br />Addition. A specific easement for this purpose needs to be provided if this <br />is to be the location of the landscaping. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />e <br /> <br /> <br />TJM:tw <br /> <br />230/226-1503.jun <br />
The URL can be used to link to this page
Your browser does not support the video tag.