Laserfiche WebLink
<br />Hillside Crossing Commercial <br />June 21, 1994 <br /> <br />Page 7 <br /> <br />------------------------------------------ <br /> <br />e <br /> <br />appropriate height of the sign may be somewhere between 20 - <br />24 feet. <br /> <br />2. <br /> <br />No signage shall face or be directed toward the residential area <br />to the east. <br /> <br />3. <br /> <br />A detail of the entrance monument sign at the intersection of <br />Evans and 193rd will need to be submitted for review. <br /> <br />4. <br /> <br />No information has been submitted regarding the other <br />commercial lots in this development. However, the Planned <br />I <br />Unit Development Agreement will set forth sign requirements' <br />for those lots. Once again, monument style signs with sizes' <br />similar to those allowed on the free-standing commercial lots in: . <br />Elk Park Center would seem to be appropriate. <br /> <br />TRASH ENCLOSURE <br /> <br />1. Specific dumpster location and enclosure design will need to be <br />submitted for review. <br /> <br />e <br /> <br />2. <br /> <br />All enclosures should be large enough to accommodate recycling needs <br />by all the tenants. <br /> <br />3. If it is anticipated that cardboard waiting to be recycled will have to be <br />stored outside, consideration should be given to incorporating the <br />storage area into the plans and provide adequate screening. <br /> <br />BUILDING ELEVATIONS <br /> <br />The developer has submitted building elevations, however, the plans <br />apparently have been modified. The exact type of material (either concrete <br />block or precast tip up panels) has not been determined at the time of <br />writing this report. Therefore, staff is unable to make any comments <br />regarding the building elevations or architecture of the building and how this <br />element would tie into the overall development. The developer has indicated <br />that plans should be made available for the Planning Commission by <br />Tuesday night's meeting. <br /> <br />SUMMARY <br /> <br />e <br /> <br />At this time, Phase 1 is the only portion of the proposed Planned Unit <br />Development that is receiving site plan recommendation. There are quite a <br /> <br /> <br />hillside.pc <br />