My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10. SR 05-16-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
05/16/1994
>
5.10. SR 05-16-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:36 AM
Creation date
10/9/2006 4:09:30 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/16/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />Mr. Pat Klaers <br />May 10, 1994 <br />Page Six <br /> <br />22. Elk River Crossing Development <br /> <br />This is the proposed commercial development located on the Earl Hohlen property <br />on the east side of TH 169 at Main Street. The Developers have submitted an entire <br />package to City staff at this point, minus one component which should be coming in <br />shortly. That component is traffic issues which are waiting for comment from <br />MnDOT's Brainerd office. The submittal package is currently being reviewed by <br />City staff and is anticipated to begin its way through Planning Commission and City <br />Council next month. <br /> <br />23. Hillside Crossing Development <br /> <br />This is the commercial property located adjacent to TH 169 at 193rd Avenue. This <br />is part of the preliminary plat for Hillside Estates 1st, 2nd, and 3rd Additions. The <br />Developer is currently working with City staff to complete the submittal package. <br />The package will then be reviewed and brought forward to the Planning Commission <br />and City Council next month. <br /> <br />e <br /> <br />24. Western Area Phase 2 Improvements <br /> <br />This project includes the extension of trunk sanitary sewer and water westerly to <br />serve the County facility. It also includes the extension of Orono Parkway to Joplin, <br />the construction of Joplin from County Road 30 to TH 10, and potentially the <br />extension of utilities throughout the Sandpiper Estates development. The feasibility <br />study has been ordered and will be presented to the City Council at their June 6th <br />meeting. If the City Council desires to have sewer and water available to the County <br />in 1994, plans and specifications will likely have to be ordered concurrently with the <br />scheduling of a public hearing on this project. The feasibility study will provide <br />more detailed information relative to project schedule. <br /> <br />25. East TH 10 Utility Improvements <br /> <br />The study is currently being worked on. A draft report should be available by late <br />June. From these, meetings could be held with the affected property owners. The <br />construction of these improvements is dependent on the WWTP upgrade being <br />completed. <br /> <br />26. <br /> <br />CSAH No.1 <br /> <br />e <br /> <br />The City Council previously passed a resolution requesting that Sherburne County <br />prioritize the improvement of CSAH #1 from Proctor Avenue up to the golf course. <br />The County Engineer has indicated that he will attempt to budget for this <br />improvement over the 1995-1996 construction seasons. We are currently working <br /> <br />230/000-1106.may <br />
The URL can be used to link to this page
Your browser does not support the video tag.