<br />e <br /> <br />Mr. Pat Klaers <br />May 10, 1994 <br />Page Five <br /> <br />17. Elk Park Center Internal Improvements <br /> <br />The internal sanitary sewer, water, storm drainage, and parking lot improvements for <br />the Elk Park Center development will be undertaken by Kraus Anderson. It is <br />anticipated that grading will be starting within the next 7-10 days, followed closely <br />behind by the remainder of construction. We will be involved in the inspection of <br />this work. It is anticipated that work will continue right up until the fall of 1994. <br /> <br />18. Right Turn Lane on TH 10 at Oxford Street <br /> <br />Plans have been completed for the right turn lane at Oxford Street on TH 10. This <br />turn lane was required as part of the development of the convenience/gas station at <br />the comer. This project was included with the street improvements associated with <br />the Elk Park Center development. Bid date is scheduled for May 18. Work will be <br />completed during 1994. <br /> <br />19. <br /> <br />Country Crossing <br /> <br />e <br /> <br />The preliminary plat of Country Crossing has been approved by the City Council. <br />The Developer is proceeding with plans for the improvements associated with this <br />development. It is anticipated that grading of the site will begin within the next week <br />to 10 days. The utility and street construction will likely begin by late June to early <br />July with construction completion by the fall of 1994. <br /> <br />20. <br /> <br />Cherryhill Bluffs 4th Addition <br /> <br />This is the portion of that project which consists of the cul-de-sac heading north out <br />of Cherryhill Bluffs 2nd Addition. The Developer is proceeding with plans and <br />specifications for the utility and street improvements. This area was graded as part <br />of the 2nd Addition improvements. It is anticipated that construction will begin <br />within the next 60 days and be complete in the summer of 1994. <br /> <br />21. <br /> <br />Hillside Estates 3rd Addition <br /> <br />e <br /> <br />This is the section of street heading out of the 1 st Addition toward the elevated water <br />tower. The 3rd Addition consists of approximately 9 lots. The 1st, 2nd, and 3rd <br />Additions were all preliminarily platted at the same time. The final plat for the 3rd <br />Addition will be presented at the City Council at the May 16th meeting. The <br />watermain and sewer have already been installed as part of the project that brought <br />the trunk watermain to the water tower. Therefore, only street and storm drainage <br />improvements will be needed to complete the improvements for this area. It is <br />anticipated this work will be done in June or early July. <br /> <br />230/000-1106.may <br />