<br />e <br /> <br />Mr. Pat Klaers <br />May 10, 1994 <br />Page Two <br /> <br />4. Gary Street Water Treatment <br /> <br />This project is in final stages of completion. The plant is going through operational <br />tests at this point. Site work remains to be completed. It is anticipated that the <br />facility will be online and the contract finaled within the next 45 days. <br /> <br />5. Interim WWTP Improvements <br /> <br />The preconstruction meeting for the interim WWTP improvements was held last <br />week. It is anticipated the Contractor will mobilize to the site and construction will <br />begin on or before June 1st. The project should be entirely complete in the 1994 <br />construction season. As you are aware, this project will replace the failed RBC <br />facility and bring the City's treatment plant back into compliance until the major <br />plant expansion can take place in the future. <br /> <br />6. <br /> <br />WWTP Plant Expansion <br /> <br />e <br /> <br />Plans and specifications are being completed for the major upgrading of the <br />wastewater treatment plant facilities. It is anticipated these plans and specifications <br />will be submitted to the MPCA by early fall of 1994. Anticipating a 60-120 day <br />period for review and revisions at the MPCA, we would expect that by late 1994 or <br />early 1995 the City will have received authorization to proceed with this project. As <br />we have discussed before, the timing for proceeding with these improvements will <br />be dependent upon available financing. <br /> <br />7. <br /> <br />Heritage Landing/Mississippi Oaks/Cherryhill Bluffs 2nd Addition <br /> <br />These three new plats were constructed in 1993. The final lift of bituminous <br />surfacing was delayed until 1994 to ensure a better construction project. Now that <br />weight restrictions are about to come off, this work can proceed to be finished. We <br />would anticipate that all three of these projects will be completed within the next 30 <br />-45 days. This work also includes the repair of the driveways and the regrading of <br />the Bell driveway on Fresno Street. <br /> <br />8. <br /> <br />Meadowvale Heights 1st and 2nd Additions <br /> <br />e <br /> <br />Meadowvale Heights 1st Addition was constructed in 1993. There is one street <br />where the paving was delayed due to softness. This work will be completed in the <br />next 30-45 days. The Developer has received preliminary plat approval for <br />Meadowvale Heights 2nd Addition, which includes approximately 50 additional lots. <br />Plans and specifications have been completed for these improvements. The last time <br />we talked to the Developer, he anticipated a late June start to construction with the <br />lots being available for sale in 1994. <br /> <br />230/000-1106.may <br />