Laserfiche WebLink
<br />.MS ~ <br /> <br />AGENDA ITEM 5.10. <br /> <br />May 10, 1994 <br />CONSULTING ENGINEERS File: 230-000-00 <br /> <br />CIVil ENGINEERING. <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br /> <br />e SURVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />1326 Energy Park Drive <br />St. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612.644.9446 <br /> <br />e 9800 Shelard Parkway <br />Minneapolis, MN 55441 <br /> <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: STATUS OF CURRENT PROJECTS <br /> <br />Dear Mr. Klaers: <br /> <br />As requested, we have put together the following summary of the status of current projects <br />in the City. This list gives just a brief summary of where each project is at and is in no <br />specific order. <br /> <br />1. Elevated Water Tower <br /> <br />A 500,000 gallon elevated water tower has been constructed in the northeast area of <br />the City by CBI Na-Con. The erection of the tower was completed last fall. The <br />painting of the tower has recently been completed. This project is 99 % complete and <br />the items which remain are some site work and the cathodic protection. The tower <br />should be finaled within the next 30 days. <br /> <br />2. Northeast Area Well <br /> <br />The contract for the construction of the well in the northeast area of the City was <br />awarded by the Elk River Municipal Utilities to Traut Well Company. Due to the <br />construction on the elevated tower and weight restrictions, they have just recently <br />mobilized to the site. Construction of the well is expected to begin this week with <br />final completion by approximately mid-July. <br /> <br />3. Northeast Area Water Treatment Facility <br /> <br />The plans and specifications for a water treatment facility in conjunction with the new <br />tower and well in the northeast area of the City will begin sometime in mid-summer. <br />Once the well construction is completed to the point that the water can be tested, the <br />design process for the water treatment facility can begin. It will take approximately <br />30-60 days to complete the design, another 30 days to bid the project, with <br />construction anticipated to begin in the fall of 1994. We would hope that <br />construction would proceed to the point that the building is enclosed prior to <br />inclement weather so that work can continue inside through the winter months with <br />the entire facility online sometime in the spring of 1995. <br /> <br />230/000-1106.may <br />