My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.8. SR 05-02-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
05/02/1994
>
8.8. SR 05-02-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:36 AM
Creation date
10/9/2006 2:28:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/2/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. MSJ - <br /> <br />AGENDA ITEM #8.8 <br /> <br />CONSULTING ENGINEERS April 21, 1994 <br />File: 230-211-20 <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br /> <br />-SURVEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />1326 Energy Park Drive <br />51. Paul, MN 55108 <br />612-644-4389 <br />Fax: 612-644-9446 <br /> <br />_9800 Shelard Parkway <br />Minneapolis, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />Honorable Mayor and City Council <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: COUNTY ROAD 12/13 DRAINAGE IMPROVEMENT PROJECT <br /> <br />Dear Councilmembers: <br /> <br />As directed by Resolution 94-11, dated February 7, 1994, MSA, Consulting Engineers has <br />prepared plans and specifications for the County Road 12/13 Drainage Improvement Project. <br />The project will alleviate flooding problems along 5th Street, west of County Road 13, and also <br />eliminate the flooding problem on the Demars property south of 5th Street and west of County <br />Road 13. The project also includes a new drainage pipe from the wetland area north of County <br />Road 12 to County Ditch No. 10. <br /> <br />Once the design.was finalized, we staked the alignment of the proposed storm sewer through the <br />affected properties east of County Road 13 and north of County Road 12. We met with the <br />affected property owners, including George Deschenes, Industrial Hardfacing, Ronald Guenther, <br />and also Weldon Schultze. Enclosed are copies of letters they signed, indicating their <br />concurrence with the proposed easements, and their willingness to provide these easements at <br />no cost to the City of Elk River. Easement descriptions have been prepared for each of the <br />above listed property owners, and easement documents could easily be prepared by the City <br />attorney should the City Council want to proceed with the project. <br /> <br />We are continuing to coordinate the project with Sherburne County and the U.S. Army Corps <br />of Engineers. The Corps of Engineers has jurisdiction over the wetlands, while Sherburne <br />County has jurisdiction over the County Road right-of-way, and also the County Ditch. <br /> <br />Enclosed for your consideration is a resolution which approves the plans and specifications and <br />authorizes the advertisement for bids for the County Road 12/13 Drainage Improvements. <br /> <br />Sincerely, <br /> <br />MSA, CONSULTING ENGINEERS <br /> <br />y~ <C. ;1~ <br /> <br />David E. Nyberg <br />Staff Engineer <br /> <br />Enclosures <br /> <br />211-2101.apr <br />
The URL can be used to link to this page
Your browser does not support the video tag.