Laserfiche WebLink
<br /> <br />BID TABULATION 181ST AVENUE W ATERMAIN EXTENSION <br /> SCHEDULE 1.0 . 181ST AVENUE WATERMAn'.. <br />1 2021.501 MOBILIZATION LS 1.00 $2,500.00 $2,500.00 $11,000.00 $11,000.00 <br />2 2504.602 INSTALL HYDRANT AND VALVE EA 2.00 $5,501.00 $11,002.00 $5,420.00 $10,840.00 <br />3 2504.602 CONNECT TO EXISTING WATERMAIN EA 2.00 $4,700.00 $9,400.00 $3,700.00 $7,400.00 <br />4 2504.602 16" BUTTERFLY VALVE EA 2.00 $7,500.00 $15,000.00 $4,540.00 $9,080.00 <br />5 2504.603 DIRECTIONAL DRILL 16" HDPE (DIPS) LF 2,689.00 $99.38 $267,232.82 $106.00 $285,034.00 <br />T BID SUMMARY - TOTAL $305,134.82 $323,354.00 <br /> == = <br /> I HEREBY CERTIFY THAT TIllS IS AN ACCURATE TABULATION OF <br /> THE BIDS RECEIVED FOR THE ABOVE MENTIONED PROJECT. <br /> - <br /> NAME: Terry Maurer, City Engineer <br /> DATE: September 13,2006 <br /> MN REG NO.: 15316 <br />Bid Tabulation-l 81st Ave Watermain Ext. September 13,2006 3 <br /> <br /> <br /> <br />