Laserfiche WebLink
<br /> <br />$15,000.00 <br />$10,93(}.00 <br />$8,928.00 <br />$9,610.00 <br />$250,077.00 <br /> <br />$294,545.00 <br /> <br />2 <br /> <br />BID TABULATION 181ST AVENUE W ATERMAIN EXTENSION <br /> SCHEDULE 1.0 . 181ST AVENUE WATERMAIN <br />1 2021.501 MOBILIZATION LS 1.00 $2,000.00 $2,000.00 $15,000.00 <br />2 2504.602 INSTALL HYDRANT AND VALVE EA 2.00 $6,386.00 $12,772.00 $5,465.00 <br />3 2504.602 CONNECT TO EXISTING WATERMAIN EA 2.00 $4,459.00 $8,918.00 $4,464.00 <br />4 2504.60216" BUTTERFLY VALVE EA 2.00 $7,271.00 $14,542.00 $4,805.00 <br />5 2504.603 DIRECTIONAL DRILL 16" HDPE (DIPS) LF 2,689.00 $82.00 $220,498.00 $93.00 <br />T BID SUMMARY - TOTAL $258,730.00 <br />Bid Tabulation-18Ist Ave Watermain Ext. September 13, 2006 <br /> <br /> <br /> <br />