My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.0. SR 04-21-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
04/21/1994
>
10.0. SR 04-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:34 AM
Creation date
9/26/2006 3:47:02 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />". <br /> <br />MS <br /> <br />e <br />COXSlilm~G K~G1~EEltS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNICIPAl <br /> <br />PlANNING <br /> <br />STRUCTURAl <br /> <br /> <br />.R\lEYING <br /> <br />TRAFFIC <br /> <br />TRANSPORTATION <br /> <br />1326 Energy Pari: Drive <br />St. Paul, MN 55108 <br />612-644-<1389 <br />Fax: 612-644-9446 <br /> <br />_00 Shelard Parkway <br />"-nneapolis, MN 55441 <br />612-5<16-0<132 <br />Fax: 612-544-6398 <br /> <br />March 22, 1994 <br />File: 230-152-12 <br /> <br />Mr. Steve Ach <br />City Planner <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: ELK PARK CENTER <br />PHASE 1 SITE PLAN REVIEW <br /> <br />Dear Mr. Ach: <br /> <br />As requested, we have reviewed the Phase 1 site plan information provided for the Elk Park <br />Center project. In our review, we avoided those cross-hatched areas which are shown as <br />future phases. We understand these areas will go through a site plan review when they are <br />developed. Also, in an effort to add clarity, we have structured our comments by page <br />number. Some issues which appear on more than one page are only listed once. <br /> <br />Based on our review, we would offer the following comments: <br /> <br />1. <br /> <br />The package of infonnation we reviewed contained the following sheets prepared by <br />Ankeny, Kell, Richter, Walsh Architects P.A. and John Oliver and Associates. <br /> <br />P~ee No <br />A1.1 <br />A2.1-2.3 <br />A3.1 <br />L2.1-2.3 <br />E1 <br />C1.l <br />C2.1-2.4 <br />C3.l-3.4 <br />C4.l-4.4 <br /> <br />Ii1le <br />Key Plan <br />Site Plan . <br />. Elevations <br />Landscape Plan <br />Site Plan Lighting <br />Civil Sheet Index <br />Site Dimension <br />Sanitary Sewer and Water Plan <br />Grading and Drainage Plan <br /> <br />We also reviewed a set of storm water calculations prepared by John Oliver and <br />Associates. <br /> <br />TJM:tp <br />230/1 52-2212.mar <br />
The URL can be used to link to this page
Your browser does not support the video tag.