My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 04-18-1994
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1994
>
04/18/1994
>
6.3. SR 04-18-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:32 AM
Creation date
8/22/2006 1:27:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/18/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Commercial Asphalt <br />April 18, 1994 <br /> <br />Page 5 <br /> <br />e <br /> <br />11. THAT THE BAGHOUSE FILTER IS TESTED ONCE PER MONTH <br />FOR LEAKS AND THE RESULTS OF THOSE TESTS ARE COPIED <br />TO THE CITY. <br /> <br />12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN ONE <br />YEAR AND A NEW PERMIT BE OBTAINED AT THAT TIME. <br /> <br />13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE <br />PLACED IN SURFACE WATER AND FURTHER THAT RUN-OFF <br />FROM THESE STOCKPILES IS DIRECTED AWAY FROM ANY <br />SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE <br />LIMITED TO THE AMOUNT OF MATERIAL THAT COULD <br />POSSIBLY BE USED IN ONE YEAR, BUT NOT NECESSARILY TO <br />WHAT WILL BE USED IN ANY ONE GIVEN YEAR. FURTHER, <br />THAT THE CITY UNDERSTANDS WITH THIS STIPULATION <br />THAT SOME RECYCLABLE MATERIALS WILL BE RETAINED <br />OVER THE WINTER SO THAT RECYCLING CAN START AT THE <br />SAME TIME AS SPRING START UP FOR THE ASPHALT PLANT. <br /> <br />e <br /> <br />14. THAT COMMERCIAL ASPHALT CONTINUE TO WORK WITH CITY <br />STAFF TO RESOLVE PROBLEMS WITH ODOR AND NOISE IF <br />THEY ARISE. <br /> <br />15. AT STAFF'S DISCRETION, COMMERCIAL ASPHALT IMPLEMENT <br />PART OR ALL OF THE PREVIOUSLY LISTED ACTIONS TO <br />ELIMINATE SEDIMENT FROM BEING INTRODUCED TO THE <br />POND ON THE EAST SIDE OF HIGHWAY 169. <br /> <br />16. COMMERCIAL ASPHALT SHALL REDUCE ODOR FROM THEIR <br />PLANT TO ACCEPTABLE LEVELS BY MODIFYING THEIR <br />OPERATIONAL PROCEDURES OR PLANT EQUIPMENT. THE <br />ELK RIVER PLANNING COMMISSION WILL REVIEW THE ODOR <br />ISSUE AGAIN IN JUNE OF 1994. <br /> <br />e <br /> <br />cc-aspha.council <br />
The URL can be used to link to this page
Your browser does not support the video tag.