Laserfiche WebLink
<br />Commercial Asphalt <br />April 18, 1994 <br /> <br />Page 4 <br /> <br />e <br /> <br />2. <br /> <br />THAT THE LEAD CONCENTRATION IN FUEL OIL COMPLY WITH <br />CURRENT MPCA REGULATIONS OR BE NO MORE THAN 4,000 <br />MG/KG, WHICHEVER IS LESS. FURTHER, THAT ANALYSIS OF <br />LEAD CONCENTRATION BE PROVIDED AS PER MPCA'S <br />REQUIREMENTS. <br /> <br />3. THAT A MAXIMUM OF 20% OPACITY IS ALLOWED FOR <br />EMISSION FROM THE STACK FOR THIS OPERATION. <br /> <br />4. THAT PARTICULATE EMISSIONS BE LIMITED TO A MAXIMUM <br />OF .04 GR/DSCF. <br /> <br />5. THAT ALL CORRESPONDENCE BETWEEN BARTONS AND MPA <br />INCLUDING TEST RESULTS BE COPIED TO THE CITY. <br /> <br />6. THAT BARTONS BE ALLOWED TO USE BAGHOUSE FINES IN <br />THEIR ASPHALT MIX, BUT THAT THESE FINES MUST BE KEPT <br />IN AN ENCLOSURE TO AVOID WINDBLOWN LEAD <br />CONTAMINATION. <br /> <br />e <br /> <br />7. <br /> <br />THAT THE NATURAL VEGETATION BETWEEN THE PROPOSED <br />ASPHALT PLANT AND HIGHWAY 169 BE LEFT TO ACT AS <br />SCREENING. FURTHER, THAT ADDITIONAL PINES ARE <br />PLANTED TO FURTHER SCREEN THIS AREA. <br /> <br />8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO <br />AVOID DUST. <br /> <br />9. THAT BARTONS REIMBURSE THE CITY FOR THE COST OF <br />REVIEWING THEIR PROPOSAL. THAT THE CITY HAS THE <br />RIGHT TO CLOSE THIS OPERATION DOWN IF THERE IS <br />IMMINENT DANGER AND THAT CITY STAFF HAS THE RIGHT <br />TO INSPECT THE PREMISES AT ANY REASONABLE HOUR <br />FOLLOWING NOTIFICATION. <br /> <br />e <br /> <br />10. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT <br />ARE FROM 7:00 AM TO 7:00 PM, SEVEN DAYS A WEEK. <br />HOWEVER, HOURS CAN BE EXTENDED FOR SPECIAL CASES BY <br />THE BUILDING AND ZONING ADMINISTRATOR AS LONG AS <br />THE ADDITIONAL HOURS DO NOT CREATE A NUISANCE FOR <br />SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS <br />MUST BE ADHERED TO AT ALL TIMES DURING THE <br />OPERATION OF THIS PLANT. <br /> <br />cc-aspha.council <br />