Laserfiche WebLink
<br />DEC-30-93 THU 9:20 <br /> <br />· M~ <br /> <br />CONSUL'IUG RNGINRS <br /> <br />CIVil ENGINEERING: <br /> <br />ENVIRONMENTAl <br /> <br />MUNlC:PAI <br /> <br />PlANNING <br /> <br />STRUCTURAl <br />_ <br /> <br />SURVEYING <br /> <br />r,QAFFIC <br /> <br />TRANSPORTATION <br /> <br />1 326 Energy Pork Drive <br />51. Poul. MN 55108 <br />612-64.(.4389 <br />Fox: 612.64.(-9446 <br /> <br />_9800 Shelard Parkway <br />Minneapolis, MN 55441 <br />612-546-0432 <br />Fax: 612-544-6398 <br /> <br />MSA CONSULTING ENGINEERS <br /> <br />FAX NO. 6126449446 <br /> <br />P. 02/04 <br /> <br />r- <br /> <br />December 29, 1993 <br />File: 230-000-00 <br /> <br />Ms. Lori Johnson <br />Finance Director <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: CITY COUNCIL WORKSHOP MEETING <br />SATURDA Y, JANUARY 8, 1994 <br /> <br />Dear Ms. Johnson: <br /> <br />As we discusseq, this memo will give you a brief outline of the various issues that I will be <br />prepared to discuss at the City Council workshop on Saturday, January 8, 1994. They are <br />as follows: <br /> <br />1. <br /> <br />Wastewater Treatment Plant <br /> <br />I will be prepared to update the City Council on the status of the interim improvement <br />scheduled for construction in 1994, the major improvements to the treatment plant and <br />also the outcome of the variance proceeding with the Minnesota Pollution Control <br />Agency, along with the ramifications of that outcome. <br /> <br />2. <br /> <br />East TH 10 Utilities <br /> <br />The City Council has previously received a memo summarizing the outcome of the <br />survey which was taken from the properties along the Highway 10 corridor. We will <br />be prepared to show the City Council a visual representation of the survey results. <br />The issue that then needs to be discussed is how to proceed with this project. The <br />City Council basically has three options. They could a) schedule a second <br />informational meeting with a larger area represented, b) could send out another <br />question~aire to additional property owners along east TH 10, or 3) revise the East TH <br />10 feasibility study and proceed into informational/public hearings. <br /> <br />3. <br /> <br />Storm Drainage <br /> <br />There are several issues we will be prepared to discuss regarding the storm drainage <br />comprehensive plan. They are as follows: <br /> <br />000-2904.DEC <br />