Laserfiche WebLink
<br />DEC-30-93 THU 9:20 <br /> <br />MSA CONSULTING ENGINEERS <br /> <br />FAX NO. 6126449446 <br /> <br />P, 03/04 <br /> <br />e <br /> <br />Ms. Lori Johnson <br />December 29, 1993 <br />Page Two <br /> <br />a. Deertield 3rd Improvements <br /> <br />We will update the City Council on the status of the easement negotiations with <br />the Hartmans and the impact that will have on the change order to the contract <br />for which W. B. Miller was the low bidder. <br /> <br />b. SchultzlDescbene Drainage Area <br /> <br />We have met with both property owners, have walked the site, have prepared <br />a map of the area and laid out a preliminary pipe alignment for this <br />improvement. We will be prepared to show that to the City Council and <br />discuss any issues. The next step, should the City Council decide to proceed, <br />would be to describe and acquire easements for the pipe construction, and <br />prepare plans and specifications. <br /> <br />c. <br /> <br />Main/Evans Improvements <br /> <br />e <br /> <br />No work has been done on this particular drainage issue since the report which <br />discussed the options for segregating this from the overall system. We will be <br />prepared to discuss the timing of that relative to Elk Park Center improvements <br />or timing without Elk Park Center. <br /> <br />d. <br /> <br />Impact Fee <br /> <br />Several City Council meetings ago, preliminary discussion was initiated relative <br />to an impact fee for storm drainage improvements. We would like to proceed <br />with that discussion and start to think about what level of cost should be <br />associated with this type of impact fee. <br /> <br />e. Surface Water Utility <br /> <br />We have been working to begin summarizing the properties within the City that <br />would be charged for surface water utility fee. We will be prepared to update <br />the City Council on this process and would like to discuss briefly with them the <br />types of fees and how to address different types of properties such as rural <br />and/or undeveloped properties. <br /> <br />4. <br /> <br />Transportation Plan <br /> <br />e <br /> <br />This study was previously presented to the City Council in draft form and they <br />requested that two specific road alignments discussed in the report be looked at in <br />more det;ail relative to the available land to build such a roadway. We have prepared <br />a large scale exhibit of each of these showing the wetlands in the area, and will be <br />able to discuss these alignments and how they may be built some day in the future. <br /> <br />000-2904.DEC <br />