<br />e <br /> <br />e <br /> <br />e <br /> <br />6. Resolution ordering the improvement and the preparation of plans and specifications. <br /> <br />Note: This action may be taken any time within 6 months after the public hearing. <br />Beyond that a new public hearing must be held. If the project was initiated by <br />petition of the owners of more than 35 percent of the frontage, this resolution <br />must be adopted by at least a 4/5 vote. <br /> <br />7. Resolution approving the plans and specifications and ordering the advertisement for <br />bids. <br /> <br />Note: If the estimated construction cost is under $100,000 at least 10 days must elapse <br />between the first advertisement and the bid opening. Over $100,000 at least three <br />weeks (21 days) must elapse. <br /> <br />8. Resolution accepting the bids and directing the Mayor and City Administrator to enter <br />into a contract with the lowest responsible bidder must be done within one year of <br />resolution ordering improvement. <br /> <br />9. Contractor/City paperwork prior to commencing construction. <br /> <br />* Issue Notice of A ward and Contract <br /> <br />* <br /> <br />Contractor resubmits signed Notice of Award, Contract, Performance Bond and <br />insurance documents. <br /> <br />* <br /> <br />Pre-Construction Meeting <br /> <br />Discuss scheduling of construction <br />Staking <br />Conflicts with utilities <br />Special problems <br /> <br />* <br /> <br />Issue Notice to Proceed <br /> <br />* <br /> <br />Contractor resubmits signed Notice to Proceed <br /> <br />* <br /> <br />Construction begins <br /> <br />10. During construction phase, partial pay estimates and change orders are presented to the <br />City Council for action. <br /> <br />11. Resolution determining cost to be assessed and ordering the preparation of proposed <br />assessment role. <br /> <br />12. <br /> <br />City staff and City Engineer prepare file assessment roll. <br /> <br />A-2 <br />