My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.0. SR 07-10-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
07/10/2006
>
9.0. SR 07-10-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:36:24 AM
Creation date
7/6/2006 4:05:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/10/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ CITY OF <br />Elk\r.:J Elk River <br />River <br /> <br />2006 Highland Road Project <br />Construction Notes <br /> <br />Private Irriaation systems <br />The construction work involves much excavation within the road right of way. If you have an <br />irrigation system in place, please locate the sprinkler heads and valves along the road. Contact <br />the Project Inspector and let him know when they are located. If you system appears to be in the <br />way of construction the inspector will notify you and ask that you remove the heads and shut <br />down the zone in your system that is affected. The City of Elk River will reimburse the <br />homeowners for cost involved in relocating irrigation systems impacted by construction or <br />repairing damaged systems as a result of the construction. You need to provide the Project <br />Engineer with a written estimate for the work for approval prior to contracting for the work <br />privately. We recommend that the repair or relocation work not be undertaken until the sod has <br />been installed in order to avoid any future damage. Please contact the City Engineer for more <br />detailed information on this policy. <br /> <br />Private Driveway Work <br />We have discussed private driveway work with the contractor and they tell us their construction <br />schedule for the summer does not allow for them to take on more work. If you are interested in <br />constructing a whole new driveway during the course of construction please discuss this with the <br />Project Inspector. He can give you information on when would be the best time to schedule this <br />work. <br /> <br /> <br />Questions <br /> <br />Kevin Burns, Project Inspector, at (651) 271-6584 Kevin.Burns@BDMCE.com <br />John Anderson, Project Engineer, at (763) 635-1052 JoAnderson@ci.elk-river.mn.us <br />Terry Maurer, City Engineer at (763) 635-1051 tmaurer@ci.elk-river.mn.us <br /> <br />Feel free to talk to these individuals about issues or concerns you may have about the project <br /> <br />We urge you to use caution around the work site. Your assistance in reminding area children to <br />~ stay clear of construction equipment is helpful in maintaining a safe environment. Your <br />~ patience and cooperation during this construction will be appreciated. Please let your <br />children know the survey stakes represent valuable information and should not be <br />disturbed. Help us work efficiently, If we need to restake because the survey stakes are removed <br />it just takes that much longer to complete our work. <br /> <br />M ~~[]~~~~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.